• CMAX 150 Augered Pile Rig for Sale on Okorder.com System 1
  • CMAX 150 Augered Pile Rig for Sale on Okorder.com System 2
CMAX 150 Augered Pile Rig for Sale on Okorder.com

CMAX 150 Augered Pile Rig for Sale on Okorder.com

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX series spiral pile drill rig is a new type of simple drilling equipment with independent innovation, ideal for pile construction in solar panels, billboards, street lamp, fences, flagpoles, traffic signs, isolation net and simple houses, giving strong stratum adaptability and high efficiency.

The rig is equipped with a large torque rotary head for strong power, which provides strong adaptability in stratum.

The hydraulic system adjusts rotation and feed to the stratum conditions accurately, which ensures high drilling efficiency.

The rig is equipped with a pile guide device to guarantee pile verticality and quality.

The rig can be equipped with various pile connecting devices according to the pile structure and size, which makes pile insertion flexible and efficient.

In different stratum condition, the rig can be equipped with down-the-hole percussion, cutting, short spiral and other tools to achieve full stratum drilling.


MAIN DATAUNITSWDL150
OPERATION PARAMETER 
Pile diametermm76
Pile depthm1.8
CHASSIS

Track basemm1430
Gaugemm1150
Crawler widthmm250
Ground clearancemm280
Blade lengthmm1400
ENGINE

Model
YANMAR-3TNV82A
DisplacementL1.331
Power/SpeedkW/rpm16/2200
Fuel tank capacityL42.5
FEED

Length of drillrigmm3400
Feed lengthmm2000
Feed speedm/min2
Feed forcekN15
TRAVELLING

Travel speedkm/h4.7/2.6
Traction force, maxkN19
Hill climbing ability°20
ROTARY

Rotary speed, maxrpm40
Rotary torque, maxNm1500/3000
ENSION

Gross weightt3
Diamension(L×W×H)m5.65×1.4×2.6



Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Q:How many prestressed concrete pipe piles can a pile driver hit in a day?
1, a pile driver can play the prestressed concrete pipe pile in a day, and the number of skilled workers, geological conditions, as well as the quality of the pile driver. Under normal circumstances, you can hit around 400 a day.2, in order to make up for the prestressed concrete concrete cracks in the phenomenon, in the use of components (load) before, to advance a concrete pre pressure in concrete in the tensile zone, using the method of artificial force, reinforced by stretching, the retraction force of steel, the tension zone of the concrete in advance under pressure. This stored pre pressure, when the components bear the tension produced by the load when the first offset by pre stress tension zone in concrete, and with the increase of load, the concrete tension, which limits the concrete elongation, delay or not lead to cracks, which is called prestressed concrete. Prestressed concrete pipe pile is a kind of precast concrete pile, which embodies the progress of modern concrete technology and the high and new technology level of concrete products.3, [prestressing: force] is a prestressed prestressed structure in order to improve the service performance during the construction to the structure of pre applied stress structures of pre compressive stress can be wholly or partially offset load caused by tensile stress, avoid structural damage. Commonly used in concrete structure, concrete structure under load is before, in advance to put pressure on it to make it in the outside load when the concrete tensile stress compressive stress produced in order to offset or reduce the load due to the tensile stress, the structure in the case of normal cracks or crack late.
Q:I have been using a common type of 260 fence pile driver, I still feel good with the use of, I heard that the loading barrier, pile driver more cattle I'd like to ask if the loader guardrail is practical? What is the daily piling efficiency? What's the fuel consumption? Please let me know when I've got the trouble. I'll try to buy one if I know the right thing.
And, as I have seen, ha, five loaders have been used for more than a year since the purchase. There has been no major failure. It may be luck. Arguably, domestic engineering equipment should not be so used.I suggest, if you small quantities or steadfastly practical cost 260, the large quantity you can choose the loading type guardrail piling machine try very energeti.
Q:How do I maintain the hydraulic pile driver I bought?
the workload of the project; the geographical environment of the project; and the price the boss expects.
Q:What is the noise of a static pile and a diesel pile driver?
The diesel pile driver has large noise and is suitable for field construction, and the construction cost is low.
Q:What are the types of hammer pile drivers?
There are diesel tube pile driver, power source brand, Zhong Zhong brand, and Zhejiang is very popular guide rod hammer
Q:Why is AMD's CPU name a pile driver or something?
This is the core code of CPU development, the first generation of the second generation of bulldozer called piling machine perhaps there roller and so on development of a CPU architecture, the need to re design a lot, is not a simple change, process improvement etc.,
Q:Invite friends together to buy a long spiral step of 30 meters of the pile driver, told me as long as the project profits are objective, you can package to 200W/, would like to ask the experts familiar with the bank bosses according to your local market if the annual package is how much money, how much is the monthly package, or by how many meters.. Thank you。。 Thank you
3 、 this machine mainly includes two parts: hydraulic walking pile support and drilling system. The column is controlled by two variable pressure hydraulic cylinders to take off and take off.
Q:Want to mortgage a hydraulic pile driver?. Excuse me, what brand, what tonnage is more competitive?.Could you introduce the profit, expense, cash flow of piling machine, the more detailed, the better.
Yutong, 31 will do, pile driver according to drilling diameter, and drilling depth
Q:What kind of pile driver, rotary drilling machine can drill under medium weathering rock layer?
The Xugong power head, wylong machinery mechanical lock rod rotary drilling rig Yuchai engine and can be weathered rock and sediment layer in the layer below, backfill soil drilling construction
Q:How to hit a pile of photovoltaic power generation?
Hello, at present there are two kinds of photovoltaic power station pile production process, the first is to buy the prefabricated pile already,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords