Concrete Pump Trailer Pump Electric Motor HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.
Main Product Features:
1. Import generator is optional.
2. The high quality hydraulic valves and oil pump use Germen KAWASAKI products.
3. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
Product Specifications:
Parameter/ unit | HBT30 |
Max theory Output(m3/h) | 40 |
Max Pumping Pressure(MPa) | 10 |
Hydraulic system type | Open |
Power mode | Electric Motor |
Speed(r/min) | 1480 |
Power(kw) | 45 |
Valve type | S |
Diameter of oil cylinder(mm) | 180 |
High- lowe pressure switching | Yes |
Hydraulic oil tank capacity(L) | 280 |
Hopper capacity(m3) | 0.4 |
Hopper jeight(mm) | 1260 |
Total mass(kg) | 3100 |
Dimension: L*W*H(mm) | 5400/1860/1900 |
Our Advantages:
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
FAQ:
Q1: How do we guarantee the quality of our products?
A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q2: How soon can we receive the product after purchase?
A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.
Q3: If we can produce some Trailer Pump according to customers request?
A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q4: How to make a quick resolution for after service?
A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q:What are the drawbacks of concrete pump gate valve and S pipe valve?
- In addition to the use of gate valve delivery, but also requires the vertical transport pipeline in front of the installation of a horizontal transmission pipe section, the length of concrete lifting height of 1 /
- Q:What is the wall thickness of the concrete pump 125?
- Concrete pump diameter 125mm pipe wall thickness is generally 4mm, there are 4.25mm, 4.5mm, 4.75mm, need to use in accordance with the rules of transport.
- Q:What is the calculation of the unit price of concrete pump?
- Usually with the pump is related to the amount of pumping less, to charge classes to ensure that the profits; pumping more, pumping high fees, there is no need to charge.
- Q:How to install concrete pump
- 4, carefully check the boom pump and the main pump, constant pressure pump inlet valve is open.
- Q:How to wash the concrete pump with a ball
- Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
- Q:What are the precautions for the operation of the concrete pump truck?
- After the start of the concrete pump should be pumping the right amount of water to wet concrete pump hopper, concrete tank and pipe and other direct contact with the concrete parts.
- Q:What is the difference between fine stone concrete pump and tow pump?
- Equipment selection of a number of concrete pump of the first technology, is the first domestic fine stone transport equipment.
- Q:What are the standards for the use of concrete pumps?
- The concrete pump should be firmly fixed before use, support four feet to make the tire from the ground, or remove the tire.
- Q:What is the difference between concrete conveyors and concrete conveyors?
- The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
- Q:What is the name of the pump called concrete?
- The name of concrete for concrete transportation is concrete pump truck.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Trailer Pump Electric Motor HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords