Concrete Pump Truck-Mounted Sy5190thb25
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck-Mounted Sy5190thb25
Product Details
Basic Info.
Model NO.:SY5190THB25
Type:Concrete Pump
Certification:ISO9001: 2000, CE
Condition:New
Vertical Reach:25.0m
Horizontal Reach:21.0m
Reach Depth:10.8m
Engine Power:240kw
Total Weight:18900kg
Capacity of Fuel Tank:400 L
Displacement:Euro III
Max.Speed:80km/H
Brake Distance:≤10m/30km/H
Minimum Unfolding Reach Length:6.4m
Export Markets:Global
Additional Info.
Trademark:Sany
Packing:Nude
Standard:CE
Origin:China
Production Capacity:1000units/Month
Product Description
Model | SY5190THB25 | |||
Overall Specification | Length | 10000mm(32′10″) | ||
Width | 2500mm(8′2″) | |||
Height | 3860mm(12′8″) | |||
Total weight | 18900kg(41667 lbs) | |||
Boom &Outrigger Specification | Vertical reach | 25.0m(82′) | ||
Horizontal reach | 21.0m(68′11″) | |||
Reach depth | 10.8m(35′5″) | |||
Minimum unfolding reach Length | 6.4m(20′12″) | |||
Arm1 | Length | 6500mm(21′4″) | ||
Angle | 93° | |||
Arm2 | Length | 4650mm(15′3″) | ||
Angle | 180° | |||
Arm3 | Length | 4650mm(15′3″) | ||
Angle | 245° | |||
Arm4 | Length | 5000mm(16′5″) | ||
Angle | 245° | |||
Pumping System Specification | Slewing circle | 365° | ||
Outrigger spread L-R (front) | 5200mm(17′1″) | |||
Outrigger spread L-R (rear) | 2240mm(7′4″) | |||
Output | Low pressure | 100 m 3 /h(131 yd 3 /h) | ||
High pressure | 60 m 3 /h(78 yd 3 /h) | |||
Pressure | Low pressure | 8 Mpa(1160 psi) | ||
High pressure | 16 Mpa(2320 psi) | |||
Max. strokes | Low pressure | 30 times/min | ||
High pressure | 16 times/min | |||
Delivery cylinder diameter | 200mm(8″) | |||
Stroke length | 1800mm(5′11″) | |||
Hydraulic system | Open loop | |||
Hydraulic system oil pressure | 32 Mpa(4640 psi) | |||
Water tank capacity | 600 L(158 gal) | |||
Pipeline size | 125mm(5″) | |||
End hose length | 3m(9′10″) | |||
End hose diameter | 125mm(5″) | |||
Chassis specifications | Chassis model | SYM1160-01 | ||
Engine type | HINO P11C-UH | |||
Engine power | 240kW/2100rpm(326HP/2100rpm) | |||
Capacity of fuel tank | Euro III | |||
Displacement | 400 L(106 gal) | |||
Max.speed | 80km/h(50mile/h) | |||
Brake distance | ≤10m/30km/h(≤32′10″/19mile/h) |
- Q:What is the wall thickness of the concrete pump 125?
- Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
- Q:When the concrete pump in the transport of concrete before the pipeline should be what lubrication
- And then share a coup, tanker to a lot of time, the site to prepare some sugar, if the pouring time is too long, the general 9 square tank you put 1 kg of sugar can be used as a retarder
- Q:What is the treatment of concrete pump block
- Into the hopper into the 15 ~ 30L cement slurry, repeated, forcing the channel to open.
- Q:What is the performance of the 60-type concrete pump?
- Maximum theoretical concrete delivery m3 / h 69/43Maximum pump outlet pressure Mpa 13/7
- Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The net residual value is the portion of the value of the residual value minus the fixed asset clean-up fee payable after the expiration of the use of the fixed asset.
- Q:What is the meaning of cast - in - place concrete secondary grouting?
- Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
- Q:What is the cause of concrete pump blockage?
- To identify the clogging site, with a mallet to plug the concrete mixture at the plug, and then through the concrete pump is anti-pump to eliminate the block.
- Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- In the shortest possible time to deal with, replace the burst out of the elbow, or straight tube is the best way, in fact, as long as the workers skilled, command properly, for a tube that is 10 minutes,
- Q:Is it easy for small concrete pumps?
- the actual application or according to your project to select the equipment, the function is not surplus , Can not meet the requirements of the project can be.
- Q:What is the name of the pump called concrete?
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck-Mounted Sy5190thb25
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords