New Cement-based Osmotic Crystallization Waterproofing Coating
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 kg
- Supply Capability:
- 20000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Cement-based Osmotic Crystallization Waterproofing Coating Description:
Cement-based permeable crystallization waterproofing material is a kind of inorganic gray pulverous, high efficient to protect environment waterproofing material. it has a special active substances, and it has an affinity to the water.It is a kind of catalyst.It uses the intrinsic to the chemical characteristics of cement concrete and porous, with water as the carrier and the help of osmosis, transmitting y filling in the pores of concrete,to catalyze the particacles in the concrete and the ingredients of no completely hydrating happening the hydration again. And it forms of insoluble tendrils crystal and combinewith concrete into one whole. So water and other liquids from any direction is blocked, to achieve permanet effect of waterproofing, moistureproofng and protecting steel bar and reinforcing concrete structure strength.
2.Main Features of Cement-based Osmotic Crystallization Waterproofing Coating:
•Can resist to leaking in long term and tolerate for high water pressure.
•Waterproofing effect is permanent, it has the extraordinary ability to repair itself
•Having heat resistance, moisture resistance, uv resistance, oxidation resistance, radiation resistance, resistance to carbonation.
•Spending low construction cost
•Convenient for construction.
3.Cement-based Osmotic Crystallization Waterproofing Coating Specification:
Flexural strength | ≥2.80(7d) | ≥3.50(28d) | ||
compressive strength Mpa | ≥12.0(7d) | ≥ 18.0(28d) | ||
Wet base adhesive strength Mpa | ≥1.0 | |||
Permeability pressure(28d) | ≥0.8 | |||
Osmotic pressure ratio(28d) | ≥20 |
4.Cement-based Osmotic Crystallization Waterproofing Coating Images:
- Q:A complete set of basement waterproof construction program
- Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.
- Q:Villa roof leakage what general reasons, what materials to remedy
- ??Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid. Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction.
- Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
- Third, from the indoor water leakage area for waterproof maintenance.
- Q:Slope roof drains do not need to be waterproof
- need. Roof waterproof layer regardless of which form and materials, constitute the entire roof of the waterproof drainage system, all the necessary pipes, flues, drainage holes, embedded iron and pillars and other roof out of the facilities, should be done in the roof waterproof Layer to properly handle the structure of the node, with particular attention to the connection part of the soil and the drain part of the water flow.
- Q:Why should the use of high pressure perfusion waterproof plugging method
- High pressure grouting construction principle: is a special high-pressure grouting waterproof material through the high-pressure infusion equipment into the concrete crack structure extended until all the cracks (including the naked eye is difficult to meet) filled with water (water) with the cross-linking reaction, Release a large number of carbon dioxide gas, resulting in secondary pressure, high pressure and secondary pressure will be pressed into the elastomer and filled with all the gaps, to stop the purpose of leakage, it can be said that the best performance of plugging material,
- Q:Roof for the insulation, Master roof, using two waterproof construction program
- Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
- Q:There is no formaldehyde in the finished putty
- Often people are talking aldehyde color change, because the formaldehyde is very polluted environment contains a lot of carcinogenic substances, so into the wall inside unknowingly become an environmental killer.
- Q:What is the price of a waterproof window cover?
- 2, the bottom liner Composite sets of most of the finished use of the bottom liner and decorative panels. Market sales of the bottom liner and decorative panels are 1220 * 2440 mm specifications, the bottom liner thickness of 18,15,12 mm three, the production of doors and windows or cabinet liner thickness of the use of 18 mm. Bottom liner according to the different materials, is divided into blockboard, MDF, particleboard, melamine board. Commonly used for blockboard and MDF.
- Q:Can acrylic materials be perforated? How to do waterproof after punching?
- Acrylic material thickness is generally below 2MM, Plus the total thickness of glass fiber reinforced plastic materials are generally below 4MM,
- Q:Finished house bathroom waterproof household acceptance should be how to accept?
- 4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
New Cement-based Osmotic Crystallization Waterproofing Coating
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 kg
- Supply Capability:
- 20000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords