• Mixing Plant HZS Series 120m3/h Concrete  HZS90 System 1
  • Mixing Plant HZS Series 120m3/h Concrete  HZS90 System 2
  • Mixing Plant HZS Series 120m3/h Concrete  HZS90 System 3
Mixing Plant HZS Series 120m3/h Concrete  HZS90

Mixing Plant HZS Series 120m3/h Concrete HZS90

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HZS90  Description

Condition: New

Power Type: Electric

Place of Origin: Shandong, China (Mainland)

Brand Name: MEIDA

Model Number: HZS90 Concrete Mixing Plant

Power(W): 213kw

Dimension(L*W*H): 33x14m

Weight: 46.5t

Certification: CE, ISO, SGS, BV

Warranty: one year guarantee since left factory

After-sales Service Provided: Engineers available to service machinery overseas

Theoretical productivity: 120m3/h

Nominal volume: 2m3

Aggregate bin Quantity x Capacity: 4X15m3

Water System: Water Pump

Water weighing accuracy: ±1%

Discharging height: 4m

Charging volume: 3200L

Water Supply Mode: Automatic

Model of mixer: JS2000

HZS90  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Medial Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Impeller blasting/rust protection paint

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

6. New designed mast, can be used to Internal and external construction elevator.

7. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

HZS90 Specification

 Mixing Plant HZS Series 120m3/h Concrete  HZS90

HZS90 Pictures

 

Mixing Plant HZS Series 120m3/h Concrete  HZS90

Mixing Plant HZS Series 120m3/h Concrete  HZS90

Mixing Plant HZS Series 120m3/h Concrete  HZS90

HZS90  FAQ

Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What kinds of ur tower crane are available now?

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing mixing plant.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q:Hi people,Wondering what this vehicle is calledIts like a truck mounted crane that lifts cars by attaching something to the car wheels and lifting it onto the bed.sometimes they have bands that support and lift the car from the undercarriageThey had one on the programme WreckedIts not a wrecker or a tow dollyIt resembles puppet stringsI've heard it being called a 'spider crane', or a 'lifting rig'I know of only one company that sells thembut when I look for it someplace else I don't find what I'm looking forIf you look up 'crane that lifts cars' and click on the first video - that's itI just don't know what its calledI want to know its name so I can straight away type it into an auction site or something and straightaway find what I'm looking forThanks.
It will be fineYour right, your not supposed to compress it too much but just pushing it up 2 inches will not hurt the r-valueThey are using plastic to create a vapor barrierThis okay too, as long as it is sealed around the edges so no moisture can get past the plastic.
Q:How is heavy cargo lifted onto a ship?
There are many ways to lift the things through cranes.It is useful that, Jack up platforms are used as exploratory drilling platforms and offshore and wind farm service platforms.In this process, one of the heavy lift carrier company Beluga Hochtief developed a offshore jack-up vessel and the name of the vessel is Vidar.Length of this Vidar is 140.4m and width is 41m and height is 9.5m.It is very useful for the offshore wind turbine market.More details:
Q:I'm a college freshman trying to decide which housing option would be best for meThere're two options: traditional dorm (which is right on campus) and apartment (which is two blocks from school, bus comes every 15 min to pick up students from here)The cost doesn't matter hereHere are the pros and cons of each:On-campus dorm: pros: close to everything and it's easy to get to classescons: small, community bathroom, 4th floor with no elevatorOff-campus apartment:pros: has private bathroom, 2 bedrooms, kitchen, and a small living roomcons: 10 min away from school so I have to walk or take the school busBuses only operate until 6 pm so if I happen to have evening classes, I have to walk homeI don't mind walking but it'll be a hassle to get to class in the 10-degree weather.Please help me! I don't know which one to choose.If you were me, which one would you choose?
I always advise freshmen to live on campusIt will allow you to fully immerse yourself into college lifeYou will be able to take part in after school activities, eat at the dining halls, and spend time in various campus facilitiesStudents living off campus tend not to participate as actively in these activitiesAs a campus residnet, you will occasionally deal with problems which you are less likely to experience in apartment style housing (crowded bathrooms, noisy neighbors, etc.)Universities will typically help you do deal with these problems, and offer you resources when problems with dormitories become seriousOff campus apartments tend not to have a great deal of oversightApartment managers are not overwhelmingly helpful, and you'll be left to deal with conflict entirely on your ownI suggest that you start in campus housing, and familiarize yourself with your school, your clubs and organizationsOnce you get a bit older, and meet some people you'd like as room mates, then move off campusHope this helps.
Q:i have a 99 dodge ram 5.2L 318 1500The second (or downstream) o2 sensor (oxygen sensor) has been replaced 3 times nowI have been told to go back to OEM parts that came factory and not go with aftermarketi have had the entire exhaust redone from 2.5 to 3 inch pipe through out (2.5 coming off the headers) the upstream was replaced with the downstream at the same timeI have a matco scan tool so i know the code and i know its the downstream through vehicle diagnosticIf anybody has any idea on what would possible be going on i would appreciate itThe only thing me and my dad could think of is there is something wrong coming off the wiring harness like a short or the plug is bad for the wiring harnessMy truck is slightly modified (52mm throttle body with spacer, cold air intake, jet modules and chip, crane cam, 202 heads, Pro charger stage two, etc.) Any feed back would be appreciated againThank you.
P0130 is for sensor 1, the upstream O2 sensor, not the downstream sensorThat would be an unusual failure mode for the sensor element (voltage should stay at 0.45V if the sensor is dead or not making connection)0.0 volts suggests a short to ground in the wiring.
Q:i'm running a 4gauge wire from my battery to a distribution block in the cab of my truckfrom the distribution block i will have a 200w infinity basslink, a 2000w cont/4000w peak inverter and i will have a crane in the bed with a 2000lb winchvery unlikely i will ever have all 3 things going at the same timebut just in case what size fuse should i have on the 4 gauge wire coming off the battery?
I believe that painting aluminum entails first coat be an acid based primer, and that should be enough of a prep for paintI think I remember that when I worked in a company building painted aluminum AC rooftop units.
Q:We are programmin to equip a port to prepare a continuese loading from a producion line to shipsheaviest weight is 50 tons.
Well i guess,you may use cranes (either ship's cranes or shore cranes) or grabsBut most of the ship cranes cannot lift that muchI don't know with what kind of ship are you going to transport but, cape size ships( up to 170.000-180.000 deadweight tons) are mostly gearless.Panamax vessels (up to 70000 dwt) are mostly gearless as well.You may use a handymax ship (up to 50-60.000 dwt)They have cranes but mostly has a limit abt 25-30 tonsI think you should better contact with the port and ask if shore crane is available.
Q:The name of the song that is playing in the last 2 minutes, when Wilson and House are on the elevator and then walking out of the hospitalThank you
Sorry - I am the spelling and grammar police - before I answer your question, I just have to correct your spellingIt just bothers me to see words spelled incorrectly - actually in your case, it is not a misspelling, but the wrong word being usedYou used through instead of throwThrough means to experience something or to enter something - going through a doorway, going through a divorceSorry, I had to do thatIn answer to your question, it is fine to throw yourself a housewarming party, especially if it is your first placeIt doesn't matter if you are renting or own the place, it is your first place and your first accomplishment, so it is a big deal.
Q:A former employer has a class action lawsuit filed against him for non-payment of overtimeTwo employees were fired as soon as he found out they filed the lawsuitNow the employer is saying he doesn't have to pay overtime to any employee that drove a Crane truckHe said there is a law that says if you drive this truck 1 day then that exempts him from paying OT for a period of 4 months and this is for every day you drive itCan anyone give me more information about thisIf someone can really help me I would be glad to email you more informationOne person that worked there also filed with the labor board.The labor board found him guilty and he paid all current employees OTKeep in mind these people drove this truck alsoHis attorney says he can pay overtime to who he wants and just because he paid them their back overtime doesn't mean he has to pay everyone.
Unless you have already purchased this amp, then you will be wasting your moneyThere are several good, cheap class D mono block amps out thereLook on EbayType in class D and lookAlways look at the RMS wattage, not the peakAnd make sure that you are running and acceptable ohm loadWith two 4ohm single voice coil subs you will see a 2ohm mono loadMost, if not all of the class D amps will handle this.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords