Wheel Backhoe Loader for Sale Sz40-15e
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Wheel Backhoe Loader for Sale Sz40-15e
Product Details
Basic Info.
Model NO.:SZ40-15E
Service:1 Year
Power:74kw
Bucket Capacity:0.4m3
Rated Load:1500kg
Export Markets:Global
Additional Info.
Trademark:XIAJIN MACHINERY
Packing:Pack in Container or Ship by Whole Machine
Standard:CE and ISO
Origin:Xiamen
HS Code:84295100
Production Capacity:1500 Set/Year
Product Description
Enlarged operator cabin, with secure glass, is capacious and brightsome.
Working table:water temperature, oil temperature, current, are all in sight.
Adopt Cummins engine and the power is stronger.
Famous brand hydraulic components and imported main pump are adopted.The operating life is long and the operating speed is fast.
Adjustable seat, convenient and comfortable to use.
Hydraulic steering, comfy and convenient to operate.
Hydraulic traction, configured with advanced gear oil pump and infinitive stage transmission inland.
Completely have the all functions of minitype digging machines.
Ascendant performance of complete appliance, with extraordinary operation efficiency.
With which many kinds of optional components can be matched to meet requirements of different users.
TECHNICAL | PARAMETERS |
Max.Digging Depth | 3000mm |
Max.Digging Height | 5600mm |
Max.Digging Radius | 5200mm |
Max.Digging Height | 4300mm |
Bucket Capacity | 0.4m3 |
Working Efficiency | 30-60m3/h |
Working Times | 4-7times/min |
Max. Hauling Force | 29kn |
Max. Swing Angle of Boom | 180° |
Max.Dumping Height | 2900mm |
Min. Rotary Radius | 5000mm |
Max.Dumping Distance | 950mm |
Rated Loading Mass | 1500kg |
Lifting Time of Movable Arm | 3.5s |
Falling Time of Movable Arm | 2.5s |
Summational Time | 7.0s |
Max. Breakout Force | 10.5kn |
Model | 4BTA3.9-C100 |
Rated Power | 74kw |
Rated Revolution | 2400r/min |
Working Pressure | 28MPa |
Max.Flux | 63ml/r |
Total Weight | 5500kg |
Gradeability | 25% |
Walking Speed | ≤39km/h |
Distance Between Axles | 2700mm |
Min. Ground Clearance | 250mm |
Overall Dimension(L×W×H) | 7600×2005×2700mm |
- Q:Where do I need the excavator?
- A place where excavators are needed:1 、 Luqiao construction company: engaged in road construction, bridge construction, tunnel excavation, large-scale bridge construction.2 、 municipal construction company: engaged in the laying of natural gas, pipelines, water pipes, sewage pipes, pipe network, the old city transformation, metro development, high-rise buildings, rural construction and transformation.3, energy, metallurgy, hydropower station construction, coal mine development, building materials and oil and gas pipeline laying and other projects.4, water conservancy construction, dredging, dredging, cofferdam filling sewage, artificial digging lake.Excavator, also called excavating machinery, is a kind of earthmoving machine that uses bucket to excavate material that is higher than or lower than the machine surface and is loaded into transportation vehicle or unloaded to the stacker. Excavators are mainly made of soil, coal, sediment, and soil and rocks that have been pre - loosened. From the development of engineering machinery in recent years, the development of excavator is relatively fast, excavator has become one of the most important construction machinery in engineering construction. The three most important parameters of excavator are operation weight (quality), engine power and bucket bucket capacity.
- Q:What do excavators do?
- Mainly used in the construction process of excavation tasks, such as digging the ground, digging the basement, leveling the road, or in the mining industry, such as mining iron ore
- Q:We had to transplant a group of approx. 10 ft. tall Arbavida trees in July. It was all done with the use of a mechanical shovel (excavator). I'm wondering how long is it necessary to water them?
- all the way to winter.... these first months, the little new feeder roots are pushing their way thru the soil , expanding their area to draw water and nutrients.... if the soil goes dry, it's very hard for the little things to push thru ... so the soil should remain moist to make it easier for them .... makes for a happier tree!....
- Q:y does my electric yellow always dig massive holes? i recently switched to a planted tank with fine graval and now he diges holes and its very annoying. is there any way to get him to stop and maby take his mind off of it. its amazing how much rock he can move overnight. hes like a excavator lol.
- chiclids will continue to uproot your plants, it is for that reason they tend to be kept in aquariums decorated with rocks and such
- Q:31 excavator factory coding rule is how, it is best to illustrate, thank you!
- 31 meaning of excavator number (used in 04-06):Example LSY822C19060320L: China06: year of productionSY: 310320: the production of serial number8: crawler type22: whole weightC1: Model9: check code31 meaning of excavator number (used in 06 years):06SY22210318:06: year of productionSY: 3122: whole weightType 21:C50318: the production of serial number
- Q:HOW TO BECOME AN ENVIRONMENTAL CONTRACTOR EXCAVATION IN TEXAS?
- Well, to become an environmental excavation first you have to be land. Oh, I think you mean excavator. Then you'd need excavation experience and excavation equipment (backhoes and such). You'd probably need certification of some kind. For government jobs (the most common) you'd probably need to bid on a project, and they take the best bid. Texas government sites should have specific information on this. Knowledge of soil types, environmental habitats, erosion control, etc. would be useful.
- Q:Which department of excavator operation certificate is issued now?
- Excavator driving learning costs, this is not fixed, generally based on learning methods inconsistent charges. The pack learns to keep it around 5000. There are some teachers with Fu study, on-site operations on the site. The cost is more expensive, but there is also a cheaper one.And so that my tuition pricing in different regions of the different charges are different...The operating permit, operation certificate is present before the Bureau of Quality Supervision issued certificate of workers, but the excavators, loaders, bulldozers, rollers the operation certificate into the administration's inside the motor vehicle driving operation. Therefore, posts, the General Administration of work safety bureau with the Quality Supervision Bureau issued operating certificate shall prevail. Professional qualification certificate at the beginning, middle, senior, mainly used for job title assessment and wage increase.As far as the present Regulations are concerned, the driving permit of excavators shall be issued by the safety supervision bureau.
- Q:How much is the tuition fee for Sichuan excavator?
- Practice lesson: increase the level and forehand exercises on a monthly basis. Students can basically complete the task of moderate difficulty. The main materials are soil, coal, sediment and soil and rocks that have been pre - loosenedPractice lesson: dig various ways of unloading soil, Lou Ping in various ways, simple slot skills.Theory course: study the whole content of one and a half months, increase the work of hydraulic component, the working principle of hydraulic pump, the fault judgment of engine, the hydraulic principle, the fault judgment of the system, the periodic maintenance of excavator.We provide you with information and information.Theory course: on the basis of a month, increase the hydraulic circuit replacement technology.Practice class: learning a half course, increase the ground leveling, super deep, super wide loading technology, groove mining, climbing downhill, up and down carts, trimming slope repair and use broken technology. After the completion of this stage, students can do special difficulty mining, climbing, walking freely.
- Q:Full hydraulic crawler excavator should not walk more than several thousand meters per hour.
- The walking speed is 5 km / h.Usually 6 kilometers per hour
- Q:I live in a condo complex. Four years ago there was an irrigation problem in front of my unit because my sidewalk was uneven. When it rained water would collect and cover the sidewalk. The board members at the time decided to cut corners and rather than raise the sidewalk, they simply punched 2-3quot; diameter holes in the cement (12 of them in a span of 10-15 feet!)...and now...there is no dirt under the sidewalk and when we have a good rain, water runs out from underneath the sidewalk and there's a moderate sized 'stream' that flows toward my porch. This stream has eroded ALL the soil from in front of my porch and I've lost several bushes because of it and my porch bricks are crumbling from the water damage. What type of contractor do I call to break up the old sidewalk, fill in the missing dirt and build a new sidewalk? What type of contractor would have the knowledge to fix this? A general contractor? Concrete guys? Landscapers? Plumber/excavators? Please help...
- Hello! okorder and what you are willing to pay and masonry contractors will bid to earn your business. Your contact details remain private. Good Luck!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Wheel Backhoe Loader for Sale Sz40-15e
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords