• Topkit/Topless Tower Crane Free Standing Height 50.5M System 1
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 2
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 3
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 4
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 5
  • Topkit/Topless Tower Crane Free Standing Height 50.5M System 6
Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Topkit/Topless Tower Crane Free Standing Height 50.5M:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Topkit/Topless Tower Crane Free Standing Height 50.5M:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our Topkit/Topless Tower Crane Free Standing Height 50.5M:


ItemParameter
Free standing height (m)50.5
Max height with attachment (m)200
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 60m(t)2.4
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYZPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-5.5KW×2
Climbing speed(m/min)0.5
Counterweight(t)48m jib 54m jib60m jib
15.4517.8518.9
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Total power(KW)63
Cable type ( within 35 meters from site power source to lower electric box of tower crane )50mm2(3+2, 5 cores)
Startup voltage & current380V×95%=361V       219A
Rated working voltage & current380V/121A

Topkit/Topless Tower Crane Free Standing Height 50.5MTopkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M

Topkit/Topless Tower Crane Free Standing Height 50.5M


Topkit/Topless Tower Crane Free Standing Height 50.5M

FAQ Topkit/Topless Tower Crane Free Standing Height 50.5M;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
Q:How to improve tower crane industry in china?
Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:Who was the guy called the Headless Horseman in the story of Ichabod Crane?
In the Washington Irving version of the story (which may be the original, I don't know if he based it on an earlier story or not), the Horseman is the ghost of a Hessian mercenary who fought died during the American Revolutionary War (if you don't know about this, Hessians were German mercenaries that were hired by the British). However, in this story, the guy never is given a name. He might be given a name in other versions of the story, but I am only really familiar with the Washington Irving version the various movies based on that story.
Q:Is boom truck a crane truck? Are they the same or two different kind of truck?
A 'boom' is attached to a flat-bed truck and is used to unload a heavy delivery (usually building supplies and materials) to a specific location. A 'crane' is similar except that it doesn't unload things. It is attached to a truck and is used for moving heavy objects and materials from one place on another on the same property.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
the lift capacity of the Crane is pretty much dictated by the type of crane it is. The largest Gantry / Bridge type is capeable of 1,500 tons.. the largest tower is 100 tons w. a 100meter turning radius. Tracked lattice boom type is 1,600 tons...........(self contained) there's one that will do 4000 tons with modifications including seperate tracks for counterweights
Q:What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q:so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
They put a crane on the ground, and they build 5 stories, say. Then they put the crane on top of the 5th story, and build another 5 stories, then they put it on the 10th story and build 5 more, etc. Or it's hanging on the side of the building, moving upwards as the building rises.
Q:What was the mekhane (crane) used for in Greek plays?To remove scenery between actsTo lift the king and his court to their viewing boxFor actors playing the godsIt was only used in building and tearing down the set
Behind the stage there was sometimes a crane called the 'mekhane'. Actors could be hung from the crane to play gods or monsters flying through the air. These were early special effects!
Q:On the wing chun T-shirts they got i print of a crane and a snake what do they mean and the yin and yang?
Wing Chun was developed from the five Shaolin animal styles, tiger, snake, crane, panther and monkey. The popular (incorrect) belief is that the style contains more of the crane and snake styles than of the other animal styles, hence why it is sometimes referred to as a crane and snake style. The crane, in the Shaolin system, is evasive, protective and gentle, using flowing techniques that redirect the attacker's energy, rather than fighting strength with strength. The snake is a very fast, straightforward style, protecting the centreline and attacking along straight lines with quick thrusting finger attacks. These two principals are, admittedly, very prominent in Wing Chun's use of the centre and central lines, the use of chisao (feeling) in techniques, and the use of straight, stretching techniques like the finger-strikes. (The bit that some people don't realise is that Wing Chun contains elements of all 5 styles, including tiger, panther and monkey, as well as some elements from non-Shaolin styles, such as elements of tai chi, shuai jiao (Chinese wrestling), dim mak (pressure point striking), chin na (joint manipulation) and others.) The yin-yang symbol comes from Taoism, and represents the equality of opposites, such as night and day, sun and moon, hard and gentle, forward and backward. Wing Chun, and indeed all Chinese martial arts, contain Taoist philosophies and strategies that can be explained by the use of this symbol.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords