Early Prop Head Formwork for Whole Aluminum Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Formwork-Early Prop Head Formwork
It works with steel prop to support whole aluminum formwork construction.
2. Main Features of Whole Aluminum Formwork
-Quick construction 4 day for 1 story
-High rate of turn over
-Convenient with steel prop use
3. Whole Aluminum Formwork Images
4. FAQ of Whole Aluminum Formwork-Early Prop Head Formwork
1) What can we do for you?
.We can ensure the quality of the early prop head formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q:What is the change in the aluminum template?
- Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
- Q:Now the domestic use of aluminum template project more?
- Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
- Q:In the Sheng-aluminum template installation workers, how to develop prospects
- Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
- Q:What is the development prospect of aluminum template design?
- More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
- Q:Whether a shear wall aluminum template and wood template can be mixed
- The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
- Q:Aluminum template of the aluminum template advantage characteristics
- Standard, versatility. Aluminum template specifications, according to the project using different specifications of sheet metal assembly; use of the template to transform a new building, just replace the 20 or so non-standard board, can reduce costs.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Early Prop Head Formwork for Whole Aluminum Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords