• PVC Coated Gabions net for River Bank Bridge System 1
  • PVC Coated Gabions net for River Bank Bridge System 2
  • PVC Coated Gabions net for River Bank Bridge System 3
PVC Coated Gabions net for River Bank Bridge

PVC Coated Gabions net for River Bank Bridge

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
888 m²
Supply Capability:
280000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Production description of PVC Coated Gabions net :

PVC coated gabion or also called plastic gabion which enjoys many excellent advantages, such as corrosion resistance, simple installation, easy transportation and installation, weather proof under natural destroy, no collapse even under big scope of deforming, good permeation can prevent the damage by hydrostatic. Besides these, plastic gabion is also good for plant growing and it mixed to form a integrity with the natural environment.

 

PVC Coated Gabions net for River Bank Bridge

PVC Coated Gabions net for River Bank Bridge

 

Features of PVC Coated Gabions net:
* Economic. Just fill the stone into the gabions and seal it.
* Simple installation. No special technology needed.
* Weather proof under natural destroy, corrosion resistant.
* No collapse even under big scope of deforming.
* Sludge in the stones is good for plant growing. Mixed to form a integrity with the natural environment.
* Good permeation can prevent the damage by hydrostatic.
* Less transport freight. It can be folded together for transport and further installation.

Applications:* Control and guide of water or flood * Flood bank or guiding bank * Preventing of rock breaking* Water and soil protection* Bridge protection * Strengthening structure of soil*

 Protection engineering of seaside area.

Specification of PVC Coated Gabions net:

PVC Coated Gabions net for River Bank Bridge

                PVC Coated Gabion

 

Introduction of CNBM

 

China National Building Materials (Group) Corporation (CNBM) is a state-owned enterprise in charge of administrative affairs in China building materials industry. Established in 1984, CNBM is a large group corporation of building materials with total assets of RMB 25 billion and a total staff of 30,000. Now CNBM owns more than 200 subsidiaries in and abroad the country, including wholly-owned corporations and joint ventures.

 

 

FAQ of geosynthetics :

 

What is geosynthetics ?

 

Geosynthetics form a perfect erosion control fabric used extremely widely in civil engineering to stabilize and reinforce slopes and soil under or next to roads, railways, dams, water reservoirs etc.. They can be easily applied which minimizes the time of construction, as well as they limit the resources and materials necessary.

 

What kinds of geosynthetics we have ?

 

Non-woven geotextile, geogrids, geocells, GCL, Geomembranes, Geonets, Geocomposites etc .

 

What is the geosynthetics used for ?

 

Hydraulic

 Lagooning and Water Treatment, Ornamental Ponds, Golf Courses

 Aquaculture and Desalination,Water Lagoons,Tanks, Reservoirs, Liquid Waste,Floating Cover Solutions, Drainage and Filtration

 

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

 

Civil Works

Erosion Control,Secondary Containment,Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building - Parkings,Roofing,Soundproofing

Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ??leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q:Find the construction steps for waterproof coatings
1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q:Oriental rain rain waterproof how to
Originally only a few hundred hours, they have done 3,000 hours of anti-aging test, until each test are qualified to the market. So the East Rainbow waterproof coating is absolutely trustworthy waterproof material brand.
Q:Hello, roof with SBS waterproof material bulk density is how much?
SBS Styrene-based thermoplastic elastomer is the largest yield (more than 70%) of SBCs, the lowest cost and wider application. It is a triblock copolymer with styrene and butadiene as monomer. Plastic and rubber properties, known as the "third generation of synthetic rubber".
Q:Home improvement waterproofing problem
2, the ground waterproof layer generally turned 20 cm. Use the shower parts generally do more than 2.2 meters.
Q:How does the waterproofing membrane work?
4, rolling the membrane: the first turn up the end of 1m long, with a long torch melting the bottom of the hot melt adhesive, the rapid paste fixed on the grassroots, and then re-harvest the rest of the volume. The gunmen stood on the paved webs, aligned with the corners of the rolls and the surface of the base layer with the flame of the long gun, and slowly rolled the edges by melting the hot melt. The web is pasted on the base;
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
3, painting the bottom line: for the reasonable arrangement of the daily pavement workload, must first on the basis of the program according to set the program to draw a good dividing line, the entire track and field into pieces, and then press the block by pavement. In order to ensure smooth drainage and less joints and other requirements, the use of the first outer ring after the construction process.
Q:What is the car material so that the car can be waterproof, in the rain will not leak in?
?C. metal technology and other: metal technology refers to the aluminum plate and other metal plate through the machine to suppress the concavity and convex surface, and then made of metal paint color, and finally after grinding, drawing and other production of the car stickers (car standard); Area can not be too large, can only be used for a small range of iconic car stickers.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products