• Table Formwork with Easy Installation and Best Reputation System 1
  • Table Formwork with Easy Installation and Best Reputation System 2
Table Formwork with Easy Installation and Best Reputation

Table Formwork with Easy Installation and Best Reputation

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Table Formwork Description 

 

Table formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.  

 

2. Main Features of Table Formwork

 

     -For any storey heights and slab thickness.

     -Fast in transportation and concrete casting due to pre-assmebled table unit.
     -Can choose shoring props or towers according to different loadings and height.

 

3. Table Formwork Images

 

Table Formwork with Easy Installation and Best Reputation

 

Table Formwork with Easy Installation and Best Reputation

 

4. Table Formwork  Specifications

 

Vertical shifting of table formwork is considered simplified on site with the help of Transport fork by crane.

An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane ropes and testing it on site by trail lifts.

The shifting trolley enables you to lower the table from the floor slightly and transport the table horizontally to the next location easily.

 

Table Formwork with Easy Installation and Best Reputation

 

 

5. FAQ of  Table Formwork

   

1) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

Q:What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
The transverse rod is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
Q:The relationship between the height of the scaffold and the design load
Compared with the steel pipe scaffolding, saving more than 500 thousand yuan of funds;
Q:It's like they just disappeared
They did disapear, they carried too much risk, and they were pretty dull matches, too many people and too many busted knees and what the person above me said for the two divas, i see no point in copying it
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
Q:A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q:It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
Q:I just got my ear pierced(scaffold) and I was wondering if anything would go wrong if I played sports... I play soccer Track and my coach said they would let me play soccer as long as I covered it up, but I was just wondering if I get hit or something if it would damage my ear really badly? :) Thanks lt;3
It could mess up with the tissue in your ear. My friend got one, and had to take it out when she played basketball cause she didn't want it to get messed up.
Q:Is there any other stores that are like Home Depot that sales building materials and scaffold?
I do not know where you live, but we also have a Menard's and Lowes. They both sell building materials.
Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
No. Santa doesn't like this movie.
Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
To determine the spacing between the poles, but these are theoretical things

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords