• Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM System 1
  • Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM System 2
Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: KS-MG

  • Type: Scaffolding Parts, Wire mesh

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Galvanized

  • Standard: AS1576 & AS1577

2.Packaging:pallet

3.Product Description

Model No: FAS-LP

Model Name: Scaffolding Hook-Lock Pin

Features:

1) Material: made of  Φ9 steel bar.

2) Surface: electro-galvanized/hot dipped galvanized

3) Weight: 0.1kg

4.

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring   Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring   Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring   Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring   Lock Bay Brace 1520x2000mm (5')

7.91

17.45

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
Look at how many holes are needed with a few meters of steel pipe
Q:Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords