• British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM System 1
  • British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM System 2
  • British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM System 3
British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM

British Drop Forged Swivel Coupler for Scaffolding Q235 for Sale CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  British Drop Forged Swivel Coupler for Scaffolding

  • Material :Q235

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet

  • British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM

  • British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM

  • British Drop Forged Swivel Coupler   for Scaffolding Q235 for Sale CNBM

Futures of British Drop Forged Swivel Coupler for Scaffolding

1.Material:Q235 carbon steel

2.Diameter:48.6mm x 48.6mm

3.Finish:Hot dip galvanized,Electro plated.Powder coated,Painted

4.Weight:0.98kg

5.Standard:JIS

6.Supply ability:25 containers / month

7.Minimum order:One container

8.Payment:L/C,T/T,30% in advance

9.Shipment:FOB,CIF,C&F

10.Port:Nanjing/Shanghai port

11.Advantages: High quanlity,Competitive price,Fast delivery,Safe package ,Best service and OEM service



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
The steel section size of less than 48.3 x 3.6 mm diameter, scaffold structure weight per meter under par value, can also according to AppendixTable A A.0.2 calculation, the calculation results of partial safety, step distance, vertical distance and horizontal distance between values according to linear interpolation calculation.
Q:They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
It recommends tea tree oil, or vitamin E oil applied directly to the area.
Q:What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
Q:What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
Specification and application of bowl buckle scaffold pole fittingsBowl buckle type steel pipe scaffolding rod parts can be divided into its main components, auxiliary components, special components three
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D
Q:So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Here is a good analysis and summary from Shmoop.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords