• Facade Scaffolding Steel System-top end frame CNBM System 1
  • Facade Scaffolding Steel System-top end frame CNBM System 2
  • Facade Scaffolding Steel System-top end frame CNBM System 3
Facade Scaffolding Steel System-top end frame CNBM

Facade Scaffolding Steel System-top end frame CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-TEF

  • Material: Steel/Aluminium

  • Surface: Paint/ galvanized

  • Certification: CE

2.Model No: FAS-TEF

Model Name: Facade Scaffolding System-Top End Frame

3.Features:

1. Made of high strength steel tube
2. Size:
Top Frame: 1000mm(H)x732mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement.

4.

Model

Description

Weight(kg)

Weight(lbs)

AR.COL.280

Ring Lock Collar 280mm

1.81

3.98

AR.COL.235

Ring Lock Collar 235mm

1.52

3.35

AR.CJ

Ring Lock Caster Jack

3.51

7.74

AR.SA

Ring Lock Spigot Adaptor

1.62

3.58

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffolding Steel System-top end frame CNBM

Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding load shall not exceed 270kg & nbsp; # 47; m
Q:There is a 5.0 kg pail of paint to one side, as shown. How close to the end can he approach safely? Express your answer using two significant figures. If there is more than one answer, separate them by commas.
I am looking for as shown, as I am not psychic.
Q:so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q:What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
If you can "combine", it is a good thing, you can reduce the type of components and models, to improve the use of its turnover, thereby reducing the project cost
Q:Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q:The name of the laws and regulations relating to the building, at least . The The
, Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
Q:for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products