• Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM System 1
  • Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM System 2
Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM

Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Snap on Lock Series Frame Scaffolding with Steel Q235 Q345

Name

Snap on Lock Series Frame Scaffolding with Steel Q235 Q345

Place of Origin

China

Brand name

CNBM

Size

Ø48.3*3.25*or as your request

Main Material

Q345 ,Q235

Surface Treatment

High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.

Color

Silver, Orange

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

50ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM

Snap on Lock Series Frame Scaffolding with Steel Q235 Q345 CNBM


 

Snap on Lock Series Frame
ModelDescriptionWeight(kg)Weight(lbs)
SO.WT.2682'x6'8" Walk Thru Frame Snap-on13.3029.33
SO.WT.2642'x6'4" Walk Thru Frame Snap-on12.8428.32
SO.WT.3683'x6'8" Walk Thru Frame Snap-on15.2033.51
SO.WT.3643'x6'4" Walk Thru Frame Snap-on14.7432.50
SO.WT.4684'x6'8" Walk Thru Frame Snap-on19.0241.94
SO.WT.5645'x6'4" Walk Thru Frame Snap-on19.5743.15
SO.WT.5685'x6'8" Walk Thru Frame Snap-on20.0344.17
SO.WT.353'x5' Walk Thru Frame Snap-on12.7828.18
SO.WT.454'x5' Walk Thru Frame Snap-on13.1929.08
SO.WT.444'x4' Walk Thru Frame Snap-on11.5125.38




SO.WT.368(18L)3'x6'8" Walk Thru Frame with 18" Ladder Snap-on22.9150.52
SO.APT.31083'x10'8" Apartment Frame Snap-on23.5451.91
SO.APT.3883'x8'8" Apartment Frame Snap-on19.8143.68
SO.APT.3108(18L)3'x10'8" Apartment Frame  with 18" Ladder Snap-on35.5678.41
SO.APT.388(18L)3'x8'8" Apartment Frame  with 18" Ladder Snap-on29.6165.29




SO.SBX.5685'x6'8" Single Box Frame Snap On20.6945.62




SO.DBX.5685'x6'8" Double Box Frame Snap On22.9450.58




SO.SBX.555'x5' Single Box Frame Snap On16.9637.40




SO.DBX.555'x5' Double Box Frame Snap On18.4640.70




SO.SBX.545'x4' Single Box Frame Snap 14.6432.28




SO.DBX.545'x4' Double Box Frame Snap On15.4234.00




SO.BX.5405'x40" Box Frame Snap On13.1729.04
SO.BX.535'x3' Box Frame Snap On11.6125.60
SO.BX.4404'x40" Box Frame Snap On10.7123.61
SO.BX.4204'x20" Box Frame Snap On8.3218.34
SO.BX.3403'x40" Box Frame Snap On9.3320.58
SO.BX.3203'x20" Box Frame Snap On6.9515.31
SO.BX.2402'x40" Box Frame Snap On7.9617.56
SO.BX.2202'x20" Box Frame Snap On5.5812.30




SO.BX.3683'x6'8" Box Frame Snap On17.4838.54
SO.BX.2682'x6'8" Box Frame no Snap On Lock14.5031.96
SO.BX.262'x6' Box Frame no Snap On Lock13.5829.95




SO.CAP.5765'x7'6" Canopy Frame Snap-on23.2551.26
SO.CAP.6766'x7'6" Canopy Frame Snap-on24.6254.29


FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.

Q:Scaffolding step span, span, the vertical rod spacing is how much
Distance refers to the distance between the adjacent two large bars, the middle of a protective bar.
Q:Why do a mobile tower scaffolds have wheels fitted with brakes?
So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
Q:The role of scaffolding and the basic requirements for scaffolding
1, to have enough firmness and stability, to ensure that during the construction of the specified load and climate conditions, no deformation, tilt and shaking2, to have enough area to meet the requirements of material, transportation, operation and walking3, the structure should be simple, erection, demolition and handling to facilitate
Q:Why not connected with the bracket or arch construction scaffolding
Not connected with the bracket or arch construction scaffolding, because the first construction scaffolding removed after the completion of the project, and to support or arch structure to a certain strength to remove the solidification.
Q:at what age can you get a scaffold/industrial piercing in england without parental consent?
there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.
Q:Bowl buckle scaffold steel pipe specifications should be mm
Rod: LG-120 (diameter 48*1200); LG-180 (diameter 48*1800); LG-240 (diameter 48*2400); LG-300 (diameter 48*3000).
Q:Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
A standard helix piercing isn't the same as they are on a scaffold. A helix goes front to back where as the scaffold goes through the curl in your ear. A good piercer will do this as 2 seperate piercings with small bars till it's healed. Then fit you with the bigger bar.
Q:How much is the erection height of double row scaffold
Two are better than the former.The following are given single row, double scaffolding erection height requirements:
Q:How do I know?
goto the piercing shop and ask?
Q:Thinking about getting this peircing done next. I got my first and second peircing on my lobes and neither hurt at all to me (like .5 out of 10). How much does industrial hurt out of 10? Is it a similar pain to lobe peircing? Also how long does it take to heal, until you can take it out and sleep on it?
For me, I'd rate it's pain level at about a 5. Just all depends on how well you tolerate. It's more uncomfortable than getting a lobe piercing, really not that similar. Mine took about about 6-8 months to heal for changing the jewelry, but took like maybe 2-3 months until I was able to sleep on it again. Good luck if you get it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords