• Galvanized Steel Plank for Cuplock Scaffolding System System 1
  • Galvanized Steel Plank for Cuplock Scaffolding System System 2
  • Galvanized Steel Plank for Cuplock Scaffolding System System 3
  • Galvanized Steel Plank for Cuplock Scaffolding System System 4
  • Galvanized Steel Plank for Cuplock Scaffolding System System 5
Galvanized Steel Plank for Cuplock Scaffolding System

Galvanized Steel Plank for Cuplock Scaffolding System

Ref Price:
$15.00 / pc get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Galvanized Steel Plank

Ringlock Scaffolding system  is also called Modular Scaffolding and Multidirectional   Scaffolding, the junction enables quick and easy connection of load  bearing items as well as reinforcing parts to each other with an enormous rigidity.  Ringlock System Scaffolding Standard for Construction is a tube of D48*3.5mm which material is Q235/Q345B,  Galvanized Ringlock System Scaffolding 。Ledger  for Construction is made by a tube with two wedge welded on the ends separatel,Galvanized Steel Plank by pre-galvanized steel 

Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.

We can supply various scaffoldings of different types in superior quality at  the best price with best service!

 

2.Main Features of Galvanized Steel Plank

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3. images of Galvanized Steel Plank

Galvanized Steel Plank of Cuplock Scaffolding System

 

Galvanized Steel Plank of Cuplock Scaffolding System


4. Specification of Galvanized Steel Plank

 Raw Material: steel 

 Size: 500-3000 mm or customer demanded 

 Certifies:, Element

 Technology : Forging  / welding 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered


5.FAQ of Galvanized Steel Plank

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 

 

Scaffolding refers to the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support.Architecture of the generic term, refers to the construction site in exterior, interior, or higher storey height can't construction directly.Scaffolding compared with the general structure, the working conditions has the following characteristics: 1, by load variation;2, fasteners, belong to semi-rigid connection nodes and node rigid size is associated with fastener quality, installation quality, node performance there is a big variation;3, scaffolding structure and component of initial defects, such as initial bending of bar, rust, erection of dimension error, the eccentric load, etc.;4, and the wall connection, bigger binding variation on the scaffold.The above accumulation and statistical data, the study of the problems of the lack of system does not have independent probability analysis condition, so the structural resistance adjusting multiplied by the coefficient of less than 1 its value system with using the safety factor of the calibration.Therefore, the specification adopts the design method of essentially belongs to half probability, half experience.The structure of the scaffold to satisfy the provisions of this specification requirement is the basic conditions of design and calculation.

 

 

Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Q:...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
I haven't had this piercing but i was thinking of getting one i do have an eyebrow ring and seven earrings in each ear and i use to have a tongue ring, your piercing cartilidge so it is going to sting shouldnt be too bad though for me my most painful piercing was my fourth earring hurt after that it wasnt too bad my seventh was a breeze i knew how to take care of it so that it would heal fast and not get infected. you have to daily sometimes twice a day clean it otherwise it gets infected and its been my exerpience that they get infected easy. the healing time for when you pierce cartilidge is twice that of when you pierce your lobe so about 8-12 weeks give or take as far as i know you have to be 18 to get one if your in the US (or 17 with parental consent) not sure what the age would be over in London as for reputable place most tatto parlors do piercings look for a clean place that sterlizes everything very important (again going on US standards) as for the cost not sure was 10 dollars for ear piercing at wal mart but for this kind of ear piercing i would guess 20-30 dollars cause its at leadt 50 for a eyebrow or tongue ring i know that. i hope this helps good luck
Q:THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.
Q:For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
Q:Fastener type steel pipe scaffold composed of which components?
3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
Q:What are the general specifications of bowl buckle scaffold?
2, of course, scaffolding to the new is better than the quality of steel is much improved with the old, regular use can generally be used for about 10 years, abandoning the bolt connection. Component jingpengnaike. Even if the corrosion does not affect the spelling and use. This does not require special maintenance and maintenance. Fastener type steel pipe scaffolding in general about 3 years on the need for screws and other operations. So I think it is convenient to bowl buckle scaffold. 3, disassembly more secure, more convenient, better performance than traditional fastener type steel pipe scaffolding.
Q:How long is the service life of disc scaffolding?
In the service life of the product if the corrosion and deformation can not be put into the construction of the building.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
concentration your interest on who's on the scaffold, how they react to the regularly occurring public shaming, and what the reader learns with regard to the character from examining the define of them on the scaffold.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords