• Galvanized Ringlock System Scaffolding Ledger System 1
  • Galvanized Ringlock System Scaffolding Ledger System 2
  • Galvanized Ringlock System Scaffolding Ledger System 3
  • Galvanized Ringlock System Scaffolding Ledger System 4
Galvanized Ringlock System Scaffolding Ledger

Galvanized Ringlock System Scaffolding Ledger

Ref Price:
$20.00 / pc get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Galvanized Ringlock System Scaffolding Ledger

Ringlock scaffolding system is a modular scaffolding system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. ringlock scaffolding system is widely used in platform, bridge, construction, buildings,and so on.

 

2.Main Features of Galvanized Ringlock System Scaffolding Ledger

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3. Galvanized Ringlock System Scaffolding Ledger images 

Galvanized Ringlock System Scaffolding Ledger

 

Galvanized Ringlock System Scaffolding Ledger

4.Galvanized Ringlock System Scaffolding Ledger Specification

 Raw Material: Q345

 Size: 500-3000 mm or customer demanded 

 Certifies:, Element

 Technology : Forging  / welding 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered

 

5.FAQ of Galvanized Ringlock System Scaffolding Ledger

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


 

Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:How to calculate the fastener type steel pipe scaffold
The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
A little late to be asking that question if you already have the contract, isn't it?
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:How does the second scaffold scene morally change Hester Prynne?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:i already found the force in rope 2 but im not getting the force in rope 1.
difficult situation. search in google or bing. that could actually help!
Q:Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
concentration your interest on who's on the scaffold, how they react to the regularly occurring public shaming, and what the reader learns with regard to the character from examining the define of them on the scaffold.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
Q:also apprx. what chapters is it in?
The Democrats took decrease back a majority particularly through attacking Republicans on the unpopularity of the conflict and Bush's adverse approval rankings. there have been additionally various ethics scandals concerning republicans that twelve months that led to various of them resigning their seats and a regular loss of self belief that strengthened Democrat momentum. Tom postpone resigned after being charged with marketing campaign finance violations. He substitute into never convicted. Mark Foley sexually under pressure an underage male congressional website. The Abramoff indictment solid suspicion on all and sundry in Washington, extraordinarily those in ability. Scooter Libby substitute into Indicted. It substitute into basically a nasty twelve months to be a republican. a brilliant number of the scandals disappeared after the elections and became out to be not something. some indictments caught, and extremely, in basic terms as many democrats have been grimy as republicans. yet comparable to a corrupt regime helped positioned the democrats on top of issues. Then all their can provide to question Bush and end the conflict dwindled into not something as they took over the political equipment and grew to alter into as corrupt as a results of fact those they replaced.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords