• Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader System 1
  • Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader System 2
  • Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader System 3
Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our products:

Condition: New

Brand Name: AOLITE

Model Number: ZL-18A

Place of Origin: Shandong, China (Mainland)

Type: Mini Loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):5550*1810*2750mm

Rated Load: 1000 kg

Certification: CE,BV,ISO.SGS etc

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Dimension: 5550*1810*2750mm

Loader Price Axle: Isuzu axle

Tire size: 15/90-16

Gearbox: Mechanical

Machine parts: optional

Machine size: Customized

Chinese Wheel Loader MOQ: 1set

Bucket Capacity: 0.5m³


Specifications of our products:

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Main feature of our products:

1)Comfortable operation Cab,Grammer seat, air-conditioner ,back camera can be designed as your requirement.

2)Optional engine: Quanchai 490,Sida 490,Kaidong 490,Commins Engine etc.

3)Bolt-on edge savers and segments protect the cutting edge from unnecessary wear.

4)Full hydraulic steering system, power shift transmission, easier operation.

5)All of our wheel loaders' colour can be design according to customers' requirments.

6)Various working devices are avaible, such as snow bucket, wood grapple,drum clamp, ore bucket, lose bucket, fork etc. to meet different need.

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader

Mini Wheel Loader for Sale with CE/ZL-18A Wheel Loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

Q:I am wanting to grad an Asus Crosshair IV Formula while it is on sale at my local computer store. However, I have heard that it will be possible to upgrade to Bulldozer in the future using this board. Clarification in the matter would be much appreciated.
Asus website shows that this board will have AM3+ compatibility via BIOS (currently still beta). But since it's an 8 series chipset, don't expect all Bulldozer features to work such as a new power management and clock gating capabilities.
Q:A bulldozer exerts 1000 pounds of force to prevent a 5000 pound boulder from rolling downa hill. Determine the angle of inclination of the hill.
The boulder is exerting a 5000 pound force downward, which can be broken into a component parallel to the hill (1000 pounds), and a force normal to the hill. If the angle of inclination of the hill was zero, the force would be all normal. If the angle of inclination was 90 degrees, the force would be all parallel. The majority of the force is normal to the hill, a clue that the angle is less than 45 degrees. If you diagram the forces on the boulder, you can see that the parallel force is the total force times the sine of the angle of incline. 1000 = 5000sinA (solution left for student)
Q:Or I'll settle for a steam roller...always wanted one of those. Maybe just a earth mover?? I've got at least 50 bucks to burn... It's just burning a hole in my pocket. MAYBE A TANK!!!!
get a stamp and envelope and send it to me i'll spend it for ya
Q:is this chip meant for gaming and stuff like that or for work and servers??
As far as known the release date has been set back for the fall and 2012 for the second generation of the bulldozer series,no one has good info except bits of rumors that it will hit servers first and then for gaming and home use amd is keeping this a secret you can check blogs sites but they have little info as well.
Q:Over the Past few weeks, I have been designing a gaming computer (with the help of the people here at yahoo answers) Here is the buildCase NZXT Nemesis Elite Gaming Case - Blackhttp://www.xoxide /nzxt-nemesis-elite-case-black.htmlFrom XOXIDE109.99Power: OCZ ModXStream Pro OCZ700MXSP 700W ATX12V V2.2 / EPS12V SLI Certified CrossFire Ready 80 PLUS Certified Modular Active PFC Power Supply compatible with core i7$89.
As a computer systems repair technician i would say this is a good build, especially the new 600 series gpu but i would reccomend, if you can afford it to go with the i7 2600k. If you cant afford it stick with the 2500k.
Q:The Colosseum sports arena site was cleared by using bulldozers. If the person operating the bulldozers is just moving levers, where is the work input coming from?
Move those levers wrong and you will roll a ten ton piece of equipment.
Q:okay, if a bulldozer pushed a large boulder resting on the edge of a cliff deep into a pond, when the bulldozer pushed it off, what kind of energy did it use ? A. potential energy in the boulder was transformed into kinetic energyB. kinetic energy in the boulder was transformed into potential energyC. new kinetic energy was created by the boulderD. new potential energy was created by the boulder
A is the answer. C and D don't make sense because you can't create energy. Kinetic, for example, can be like rolling down a hill--gravity pulls it. Potential energy means it's not in motion yet, but potentially can have this much energy.
Q:what job options do i have? Help...im shipping out on the 26th next month!
You haven't even gone to Recruit Training and you are worried about this? Slow down my friend, you have a long time until you are "out"
Q:How do you get past the big bulldozer?
If you have an SMG, unload on the side windows. This will break the window allowing you to cap the driver.
Q:Is the amd 4300 worth the extra money or is the 4100 decent enough?I've heard that that the bulldozers weren't that good...
The 4100 is decent enough however I would not be happy myself with a 4100 when if I spend about 10 dollars more I get a new CPU, more cool, more efficient, less power hungry, and faster!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords