• Tie rod  Wing Nut    Formwork Accessory System 1
  • Tie rod  Wing Nut    Formwork Accessory System 2
  • Tie rod  Wing Nut    Formwork Accessory System 3
  • Tie rod  Wing Nut    Formwork Accessory System 4
  • Tie rod  Wing Nut    Formwork Accessory System 5
  • Tie rod  Wing Nut    Formwork Accessory System 6
Tie rod  Wing Nut    Formwork Accessory

Tie rod Wing Nut Formwork Accessory

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Wing Nut Forged for Formwork

 

Material: Q235

Size:17mm, 70,110,130mm

Surface: electro galvanization.

Provide OEM service


Item

Forged Construction Formwork Accessories

Material

C45

Surface

electro galvanization

Note

OEM service is available

MOQ

1000pieces

Package

in steel plate or plywood plate, or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days




 

 



QQ20140724091751



 

 

 

 

Tie rod  Wing Nut    Formwork Accessory

 

 

 

 

Tie rod  Wing Nut    Formwork Accessory

 

 

 

 

 

QQ20140724092311

 

 

 


 

 

 

 

 IMG_2873

 



OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest

 

Rizhao Fast and Fasten Scaffold Co., Ltd. is a professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.




Packing

woven bag and pallet, plywood case.

 Tie rod  Wing Nut    Formwork Accessory



Why choose Rizhao Fast&Fasten ScaffoldCo., Ltd?

·         Over 10  years' industry experience

·         Cover the whole of Wiltshire

·         We undertake both commercial and domestic scaffolding

·         First class and extremely safe service

·         Competitive rates

·         Free estimates, site visits and advice

·         Provide references upon request



Q:How to maintain the scaffold after use
To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
Q:I plan on playing tennis and doing track and field at school... Im getting the piercing this month and it won't be healed in time to take it out. How can I conceal it or possibly even help it heal faster??
Why no longer enable your ear pieced lower back while you're off out of your prepare like in case you have a much better than one week holiday so which you do no longer could desire to get rid of and placed your jewelry many of the time. a minimum of you could evade preserving your ears many of the time and evade the an infection. you could enable your ears heal ideal. in case you could no longer wait to have your ear pierce lower back once you get rid of and placed decrease back your jewelry make it beneficial you sanitized your palms by skill of washing and employing alcohol. placed Neosporin (antibiotic ointment) on your new pierced jewelry and on the jewelry itself in the previous putting it decrease back. in the previous additionally they use medicated string or thread on the ears for the piercing of latest child toddlers.
Q:The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
The steel section size of less than 48.3 x 3.6 mm diameter, scaffold structure weight per meter under par value, can also according to AppendixTable A A.0.2 calculation, the calculation results of partial safety, step distance, vertical distance and horizontal distance between values according to linear interpolation calculation.
Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q:..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Execution by hanging.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder , we are Dubai based scaffolding contractor.
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:I'm reading the novel by nathaniel hawthorne. There seems to be a lot going on in the scaffold scenes that i kind of not understand. Can someone explain the significance of these scenes? I am not a fan of cliffnotes or sparknotes because i actually READ the books. please someone who has read it tell me, i appreciate it.
No. Santa doesn't like this movie.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords