• Cuplock Scaffolding for Sale Construction Electric Galvanized or Paint System 1
  • Cuplock Scaffolding for Sale Construction Electric Galvanized or Paint System 2
Cuplock Scaffolding for Sale Construction Electric Galvanized or Paint

Cuplock Scaffolding for Sale Construction Electric Galvanized or Paint

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m.t.
Supply Capability:
100000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Cuplock Scaffolding for Sale Construction Electric Galvanized or Paint

Product description: 

The locking node is formed by two cups, a fixed lower cup which is welded to the vertical member at every 500mm intervals and a sliding upper cup. First the forged blade ends of the horizontal member are connected loosely but safely to the lower cup.

1. Diagonal Description

Diagonal Description

Length

Weight

1.8 x 1.5M Cup-Lock Diagonal Brace  Hot Dipped Galvanized

2.343M

8.70kg

1.8 x 2.0M Cup-Lock Diagonal Brace  Hot Dipped Galvanized

2.691M

9.80kg

2.5 x 1.5M Cup-Lock Diagonal Brace  Hot Dipped Galvanized

2.916M

10.70kg

2.5 x2.0M Cup-Lock Diagonal Brace  Hot Dipped Galvanized

3.202M

11.50kg

3.0 x2.0M Cup-Lock Diagonal Brace  Hot Dipped Galvanized

3.606M

13.00kg

2. Standard

Standard with Spigots

Description

 Weight

1.0M Cup-Lock Standard, Hot Dipped Galvanized

5.50kg

2.0M Cup-Lock Standard, Hot Dipped Galvanized

11.40kg

3.0M Cup-Lock Standard, Hot Dipped Galvanized

16.60kg

0.4M Cup-Lock Standard, Hot Dipped Galvanized

2.40kg

Standard without Spigots

0.8M Cup-Lock Standard, Hot Dipped Galvanized

4.60kg

1.3M Cup-Lock Standard, Hot Dipped Galvanized

6.60kg

1.8M Cup-Lock Standard, Hot Dipped Galvanized

9.10kg

2.3M Cup-Lock Standard, Hot Dipped Galvanized

11.60kg

 

3. Cup-Lock Ledger

Cup-Lock Ledger


Description

                            Weight

0.6M Cup-Lock Ledger, Hot Dipped Galvanized

2.65kg

0.9M Cup-Lock Ledger, Hot Dipped Galvanized

3.73kg

1.0M Cup-Lock Ledger, Hot Dipped Galvanized

4.10kg

1.2M Cup-Lock Ledger, Hot Dipped Galvanized

4.81kg

1.3M Cup-Lock Ledger, Hot Dipped Galvanized

5.17kg

1.6M Cup-Lock Ledger, Hot Dipped Galvanized

6.24kg

1.8M Cup-Lock Ledger, Hot Dipped Galvanized

6.96kg

2.3M Cup-Lock Ledger, Hot Dipped Galvanized

9.50kg

 

 4. Cup-Lock Intermediate Transom

Cup-Lock Intermediate Transom

Description

Weight

0.565M Cup-Lock Intermediate Transom

2.80kg

0.795M Cup-Lock Intermediate Transom

3.70kg

1.3M Cup-Lock Intermediate Transom

    5.50kg

1.8M Cup-Lock Intermediate Transom

    7.30kg

 

Packing & Shipping

Packaging Details: Steel pallets, Customized package

Delivery Detail: 15-25Days


 


Q:A scaffold is constructed by placing two supports under a 18 ft, 4 in (a) board weighing 77 lbs. The supports are each 2 ft, 6 in (b) from their respective ends. Two painters stand on the board; one weighs 153 lbs and stands 2 ft, 6 in (c) from the left end of the board. Where must the 202 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:I have a cartilage piercing on my right ear and now I want scaffolding. Can they just pierce the other side of my ear (opposite my other cartilage piercing) and put a scaffold bar through my existing cartilage piercing hole and the new piercing hole opposite? Can I then get another cartilage piercing straight underneath the scaffolding? How much does it hurt? Thanks in advance :)
an industrial piercing is much different than a helix. a helix is normally pieced from the from to the back of the ear while a helix is pierced from the outside to the inside of the ear. without a picture or seeing it it's hard to say so go to your local professional. piercings don't tickle. the pain shouldn't be a concern.
Q:Standard Specification for bowl type scaffold steel pipe diameter
Scaffolding is also called full house scaffolding, its focus from low to up as follows: the pole is the thickness of 5cm plate, and the length of not less than 3 cross; sweeping bar is complete, height is not more than 10cm
Q:is it possible to have an industrial piercing done in 2 stages? so like 1 hole first and then a few weeks later the 2nd hole done. ive found a place that for 2 holes is cheaper than having the whole process done as one. Please help :)
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Bowl buckle scaffold, called bowl buckle frameThe bowl buckle frame is composed of a steel pipe vertical rod, a cross bar and a bowl buckle jointStructure of bowl frame basic construction and erection requirements and fastener type steel tube scaffold is similar, the main difference lies in the bowl. Bowl buckle connector is a connector on the bowl, bowl buckle, bar joint and the upper bowl limiting pin etc. welding buckle under the bowl and the bowl buckle pin in the vertical rod, the bowl set into the pole in the
Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
JGJ231-2010 construction of socket type plate type steel pipe scaffold safety technical regulationsTechnical code for safety of JGJ162-2008 construction formworkJGJ166-2008 technical code for safety of steel tubular scaffold with bowl buckle
Q:i need a peircing in my right ear can i do scaffolding my self? whats the risks?
Your bar may not fit properly and when i went and got mine done which hurt like loads ahhhhhh but anyways she said about the angle i have it at she has to be careful because the bar isnt ment to touch the base of your ear if you know what i mean just go get it done properly :)
Q:Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
Is there a reason you haven't any longer been to the ER or pressing care an prolonged time in the past? circulate there now. You gotta use some easy experience here. we will not make it easier to be conscious of what to do while it includes scientific judgements or making up your ideas. you are able to beware for your self.
Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
At the beginning of the Market Place chapter..it starts off with The grass plot before the jail, in Prison Lane, ona certain summer morning.... so that one is morning and in the summer and the last one....is probably in mid morning b/c its after a sermon and also..i think in the forest chapter it says something about it being in autumn *.*
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords