• Cheap Hydraulic Concrete Placing Boom for sale System 1
  • Cheap Hydraulic Concrete Placing Boom for sale System 2
  • Cheap Hydraulic Concrete Placing Boom for sale System 3
  • Cheap Hydraulic Concrete Placing Boom for sale System 4
  • Cheap Hydraulic Concrete Placing Boom for sale System 5
  • Cheap Hydraulic Concrete Placing Boom for sale System 6
Cheap Hydraulic Concrete Placing Boom for sale

Cheap Hydraulic Concrete Placing Boom for sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
15 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
  1. Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.

    2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.

    3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.

  2. Description:

    1.Includes 4 arms, hydraulic cylinder and four-bar linkage. The 1st arm is divided into two segments.
      The root of the 1st arm is connected with the swivel table.
    2.Specially designed working platform where hydraulic pump and electrical control cabinet are set on.
    3.Including slewing ring support

3.

Delivery pipe dimension (outside diameter×thickness) mm×mmφ133×4
Delivery hose dimension (inside diameter×length)  ×mm5″×3000
 Radius of placing boom(m) 38
 Stationary height(to the join between the end of the boom and swivel table) (m) 22.6
  1st section (m)2.6+5.65+6.66=14.91
 2nd section (m)7.56
Four hydraulic foldable arms3rd section (m)7.65
 4th section (m) 7.72
1st section-4.2°82.5°
Boom articulation2nd section180°
 3rd section180°
4th section180°
 (°) Slewing range360°
 Power of motor(kW)22
 (MPa) 30
Pressure of hydraulic system 

 

 

 

Q:What do concrete pumps and fabrics mean?
Cloth machine, cloth form and automobile pump is similar, it is to use conveyor belt in the state without pressure to transport concrete, cloth machine is relatively heavy, slow walking, and the delivery of concrete material falls easily aggregate segregation
Q:How to maintain the concrete spreader?
The lining of the silo is equipped with abrasion less material lining board to reduce material adhesion and reduce material arching
Q:What is the Hand operated concrete distributor?
Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
Q:How to fit the cloth rod of the distributor?
Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
Q:What is the structure of a concrete distributor?
The main frame beam is connected to the front end of a rotary bearing, and the bar, bar before, before the formation of the rotating part, in human pull around the rotary bearing, rotate 300 degrees
Q:What is the concrete distributor?
Hydraulic cloth machine, manual cloth machine (also divided into 12 meters, 15 meters, 18 meters three kinds)
Q:What are the monthly inspection items of the movable concrete spreader?
Check the insulation resistance of the circuit of the motor, the grounding of the electrical equipment, metal case and metal structure
Q:What is the working principle of the distributor?
In order to avoid the vibration disturbance of slab steel tubing, tubing must be located in the steel frame, steel bunk put wood as a springboard to the supporting surface, concrete pouring, pouring the casting from front to back, remove bracket until the Jiaowan demolished floor bracket
Q:What is the difference between concrete pump truck and concrete distributor in construction?
Automobile pump flexible tubing can flexibly rotate 360 degrees, the body shift is also very convenient, the pumping efficiency is relatively high, but the cost is more expensive.
Q:How to install and use the distributor?
Install the fuse according to the electricity consumption. No steel, aluminum or zinc wire shall be used instead of the fuse.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords