• WK-12C Mining Excavator  for mining on sale System 1
  • WK-12C Mining Excavator  for mining on sale System 2
  • WK-12C Mining Excavator  for mining on sale System 3
  • WK-12C Mining Excavator  for mining on sale System 4
  • WK-12C Mining Excavator  for mining on sale System 5
WK-12C Mining Excavator  for mining on sale

WK-12C Mining Excavator for mining on sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
3 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

WK-12C excavators are suitable for 10 million MT mining use, to be used in combination with 80-154 MT dumpers or 100 MT dumping trains.

Product specifications:

• Gear-rack crowding, powerful penetration, high efficiency;

• Propel mechanism utilizes independent drive with planetary reducer;

• Gear transmission has gears with a high hardness surface for durability;

• Drive adopts high hand drive for improved durability;

• Air release spring disk brakes (excluding hoist brakes).

• AC IGBT drive.


Technical Spec. of WK-12C

Normal bucket volume

12m³

Lifting motor

2x350kW/690VAC

Scope of bucket volume

8m³-16m³

Max. Excavating Radius

18.90m

Lifting speed

1.50m/s

Max. Excavating Height 

13.53m

Pushing speed

0.58m/s

Max. Dumping Radius

16.25m

Traveling speed

0.89km/h

Max. Dumping Height

8.60m

Max. Lifting force

1110kN

Excavating Depth

2.20m

Max. Pushing force 

541kN

Working weight 

490t

Max. Crawling angle

13°

Theoretical Productivity

1490m³/h

 

 

We have established a new production base in the Binhai New Area of Tianjin to facilitate the transportation and export of large-sized equipment. Our second wheel production line is currently under construction. We have also established production lines for wheels, axles and wheel sets for use at speeds above 200 km/h.

We are now turning our focus to international markets which we are certain can benefit from our high quality products and service. As we are constantly innovating and improving, we have no doubt that we will meet and even exceed our customers’ expectations.

 

Q:Modern 305-7 excavator oil consumption per hour, how many liters oil full load?
From the development of engineering machinery in recent years, the development of excavator is relatively fast, excavator has become one of the most important construction machinery in engineering construction. The three most important parameters of excavator are operation weight (quality), engine power and bucket bucket capacity.
Q:i cant find it and i was wonderin where it may b thanks
Consult your parts manual or call local Cat dealer and ask.
Q:What type of co. should I ask to fill my in-ground pool with dirt ?
Take bids from ground excavators, or find someone doing grading that needs a place to haul their excess dirt. You can advertise in the local paper or put signs in your yard saying you wanting free fill dirt. (Make sure they will bring it to you) Papaw
Q:The tracks are kinda loose and I want to adjust them.
you hve a plate in the front on the outside, remove the plate and you will see a grease fitting, pump grease into the fitting until you reach desired tension. aint sure what the measurment is on it but dont get to tight or youll do more harm than good. track should droop a couple inchs i would think. good luck
Q:What is the special advantage of the romantic manor iron hoe?
Although their family's reputation is the same, mining and mining moreT800 dig an ore and add 4 pointsIron ore digging and 7 point miningExcavator also energy, no energy, can not use
Q:What's the meaning of a digger outside the window?
There are seven reasons why you can't learn. 1, you have a cell phone in your hand. 2, had an idiot. 3, there's a funny guy next to me.
Q:How is the grade of excavator driver's license classification?
Excavator driver's license is a special machinery operating permit, an operating permit on the line, but also on behalf of the certificateGo to the excavator school or go to the local labor bureau or the safety supervision bureau.
Q:Steel Pokemon:Beldum x4Metang x3Metagross x2Armor Fossil x4Shieldon x2Bastidon x2Registeel x3Water Pokemon:Spheal x4Sealo x2Walrein x1Mantine x1Trainers:Bebe's Search x2Fossil Excavator x2Quick Ball x1Energy Search x2Potion x2Energies:Steel x16Waterx7
Pretty solid deck, 4.5 stars out of 5. Try collecting more cards and get other attributes. (Fire, Grass, Fight, etc.) Hope I helped!
Q:I have a 2004 Chevy 1500 LS extended cab z71 package with the 5.3l. This truck has the towing package such as transmission cooler factory class five hitch and 87k miles and I believe 3.73 axle ratio. I'm wondering if I can tow a 7000lb excavator plus trailer on a short trip 10-15 miles with only one somewhat major grade. I'm planning on having to take it really easy on the truck but just curious if I should forget the idea all together.
It should be fine as long as the Silverado is equipped with the proper electric brake control and weight distribution hitch. The truck has an 8500 lb towing capacity. Bear in mind the weight of the excavator AND the trailer.
Q:does it help cost that i dont need an electrician, i own the property already, and i have a cheap excavator? or are these just minor things?i'm extrememly new at this and Im trying to cut costs if possible. and are wood floors cheaper than having carpet put in? any answers to one or all of the questions are greatly appreciated!
owning the lot already is a huge savings. doing some of the work yourself is extremely helpful at lowering the cost, your not paying for all the labor. if your going with a builder, you need to ask if its ok if you can do some things yourself, many wont let you. what you might have to do is be your own contractor, and subcontract out the excavating, like the person you know, but you would need to check with all of the codes and get up to date on how that all works, if you need any special license to do that. like with the electric, you can do it, if you have it inspected. you would be surprised at how much you can save just even doing the finishing work yourself, like cabinets, floors, lighting, hanging the doors, fixtures, installing the shower, toilets, etc. some builders will basically bring the house to drywall, building the shell, and you can do the rest. a friend of ours is helping on his house and he cut at least 60,000+ off his price. as far as wood being cheaper than carpet, i would say not. but it all depends on which you choose and who you have install it. if you do wood floors, you can do that yourself and will save huge, and its easy, unless you lay carpet professionally i wouldnt go there, its worth having that done..

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords