construction all types of aluminum scaffold
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Brand Name: | LF | Model Number: | EH-1 |
Packaging & Delivery
Packaging Detail: | In bulk or steel pallet or as your request |
Delivery Detail: | within 25 days |
Specifications
aluminum scaffold
1.type: aluminum scaffold
2.material: aluminum
3.size: standard
4.shape: ring lock or cup lock
construction all types of aluminum scaffold
Size: 48.3*3.25*1000/2000...
Main Material: aluminum
Certificate: SGS, EN12810
Surface Treatment: HDG,Paint,Powder coating
Total Annual Sales Volume: | US$10 Million - US$50 Million | |
Export Percentage: | 91% - 100% |
- Q:What are the components of a mobile scaffolding
- The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
- Q:Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
- conch would look great and not make it look to cluttered go for it :)
- Q:i already found the force in rope 2 but im not getting the force in rope 1.
- The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
- Q:Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
- trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.
- Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- i got mine (industrial) almost 8 years ago and it cost me $42. it hurt, they do it with one needle and just go straight across your ear. my mom nearly cried when she saw it. it feels really hot and sore after you get it and you have to constantly turn the bar in your ear to prevent infection and a keloid scar. i had a keloid scar on my ear from it and when i started working i was asked to take it out. it smells funny sometimes but i loved having it. kinda miss it now. good luck! xo
- Q:Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
- Q:why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
- Q:what happened when author dimmesdale went to the scaffolding in town square?
- Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
- Q:three examples of scaffolding, thanks
- Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
- Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
construction all types of aluminum scaffold
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches
Related keywords