• Semi-electric aerial reclaimer--DYT(three masts) System 1
  • Semi-electric aerial reclaimer--DYT(three masts) System 2
  • Semi-electric aerial reclaimer--DYT(three masts) System 3
Semi-electric aerial reclaimer--DYT(three masts)

Semi-electric aerial reclaimer--DYT(three masts)

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
ModelDYT2-3.5DYT2-4.0DYT2-4.5
Rated capacitykg200
Max working heightmm550060006500
Max platform heightmm350040004500
Overall lengthmm1300
Overall widthmm840
Overall heightmm166018301990
Platform sizemm900X600
Ground clearancemm30
Wheelbasemm770
Lift motor12VDC/1.5kw
Raising/Falling speedsec15/1718/2021/23
Battery12V/120Ah
Charger12A/15A
Rear wheelmmФ150×40
Front wheelin5
Overall weightkg265315365

Standard Configuration
-Emergency stop button
-Charge lamp
-Double brakers
-Voltage display
-Strut bar for safe overhaul
-Emergency descending button
-Overload limit

 

Q:Can anyone help me identify this logo/sign
not me
Q:Kindly help me out, I prefer sanskrit. but elese english would goes
Try okorder /... and look at the other posts. Good Luck
Q:production process for 500to 700 pcs. of garment dyeing per day list of machineries used for this purpose.
sorry i can't help you there
Q:2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
Q:Tianjin Construction Machinery Research Institute?
China Construction Machinery Corporation was founded in December 2005 by the Tianjin Research Institute of engineering machinery and China Construction machinery complete sets of companies, under the China National Machinery Industry Corp. Headquartered in Tianjin, is located in Tianjin hi tech Industrial Park, covers an area of 400 acres. Existing enterprises 12, the total assets of 1 billion 800 million yuan, the total number of workers 3000 people.
Q:Could you sleep next to loud machinery?
No, I am a light sleeper and that would annoy me to no end.
Q:Machinery!
here okorder /
Q:My contractor table saw has 2hp motor first starts up caused my lights in my basement to dim and as it running seems like it has some shaking in it, I can feel in the saw table, also the basement light seems to flickering or diming out the whole time when saw is in used. Any idea what is the cause guys. I could use some advice here. By the way this motor is running on 110 volts 60 hertz.
The lights dim because the saw is pulling too many amps for the circuit it is on. To fix that problem, install a dedicated circuit (20 amp, 12 gage wire) for the saw. The vibration is most often because the base and table of the saw are not heavy enough or the motor is not attached tightly or is mis aligned. This is why good quality contractor saws always have big cast iron tables. This is pretty much the old saying of you get what you pay for. You may be able to reduce vibration if you can figure out a way to attach concrete blocks to the bottom of the table. ( By hanging them from rope wire etc.) Anything to add substantial weight. And check the alignment of the motor and the saw arbor and the motor to the arbor.
Q:i want to sell an unused candle maker
The questions need to ask yourself are: - Is the weight of the product and corresponding freight cost going to be prohibitive for anyone bidding internationally or far from my local area? - Is my product too specialised for OKorder? - do I need a large national/international group of prospective buyers to ensure a sale? You may in fact be better off finding a more specialised sales platform. Good luck.
Q:I am not native english speaker please help
machinery and book it under the head fixed assets

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords