• high-speed high-precise fully automatic slitting machine System 1
  • high-speed high-precise fully automatic slitting machine System 2
  • high-speed high-precise fully automatic slitting machine System 3
high-speed high-precise fully automatic slitting machine

high-speed high-precise fully automatic slitting machine

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

Slitting machine
Strip Material: carbon steel, galvanized plate and SS
thickness: 0.3~2,0.5~3,1~6,2~8,3~12, 6-16

0.5~3X1500 slitting line

1.Tape technical data:

1.Materials: carbon steel, electric galvanized plate and so on.

2.Tape thickness:0.5~3mm

3.Tape width:1500mm

4.Internal diameter tape:Φ480 Φ508 Φ610mm

5.The maximum outer diameter tape:Φ800~Φ2000mm

6.The maximum weight tape:15000kg

7.Shear rate: 0 ~ 100m/min adjustable

8.Width deviation:±0.03mm

9.Bending sickle deviation:±0.10mm/m

2.Equipment flow:

Coil car---Double-awal feeding body---hydraulic primer head body,shovel head,two rollers feeding---Shear head---Corrective institutions--- Slitting machine---Waste silk rolling---Looper---predictly separate material---damping institution---uncoil device---coil down car

Hydraulic control;Electric control

3. Technical Documents

Provide instruction and operation manual, foundation drawing, layout drawing, vulnerable part drawings, hydraulic system schematic drawing, electric circuit drawing before or when machine is delivered.

4.Inspection & Warranty:

According to relative standards, customer inspects machine quality.

Warranty for one year after commissioning except for mistake made by buyer wrong operation.

5. Payment

Down payment: 30% of total amount for making contract effective;The rest to be paid at the time of delivery

6. Delivery, Installation & Commissioning

Provide foundation drawing within a month after contract validation; delivery time: 90 days; Installation & commissioning: 25 days.

Usually we send two engineers to direct installation and commissioning of the slitting line, the buyer should buy round-trip tickets for them, provide food & accommodation as well as local transportation to our engineers, and give each engineer 60$ per day for their technical service.

7. Main technical parameters:

Mode

Thickness

Width

Coil's weight

Width of product

Shearing speed(max)

Area

2x1600

0.3-2mm

800-1550mm

30T

≥20mm

150m/min

21x11

4x1600

0.5-4mm

800-1550mm

30T

≥40mm

120m/min

21x11

6x1600

1-6mm

800-1550mm

30T

≥60mm

80m/min

21x11

8x1800

2-8mm

900-1800mm

30T

≥70mm

60m/min

30x11

10x2000

3-10mm

900-2000mm

30T

≥80mm

60m/min

35x11

12x2000

3-12mm

900-2000mm

30T

≥100mm

40m/min

38x11

14x2000

3-14mm

900-2000mm

30T

≥120mm

40m/min

38x11

14x2000

3-16mm

900-2000mm

40T

≥120mm

30m/min

40x12

14x2000

5-20mm

900-2000mm

40T

≥120mm

30m/min

40x12

Q:What are the advantages of cement tile machine?
A machine multi-purpose, tile mode switch fast, fool-type operation, low power, CNC molding. Unique design, multi-functional hydraulic molding, user-friendly interface operation, advanced and reasonable layout, to fill the gaps in the domestic.
Q:The processing method of the tile machine
Watt plate and tile gap is too large, generally should be 1 ~ 5mm. The gap is too large will make the tile broken, the gap will be bad top tile. The tile tray is raised too fast or jitter. Adjust the corresponding air valve can be.
Q:Analysis on the Problems of Cement Shade Machine
construction process to meet the requirements. Discoloration of the substrate in the humidity is too high, water-soluble salt crystals in the surface weathering; substrate containing alkaline, infiltration of alkaline weak paint or paint film;
Q:What steps are required during the installation of the cement tile machine?
Feeder installation: adjust the plane of the plate on the plate by the position shown in the figure. The plane of the shaking table is in a plane, and the board is aligned with the main axis to adjust the distance between the boarding machine and the vibration platform. Pallets in the transport when the smooth fall in the middle of the shaking table, the debug board will be connected to the host board and fixed.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords