• single-mast aluminium work platform GTS6K11 System 1
single-mast aluminium work platform GTS6K11

single-mast aluminium work platform GTS6K11

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Brief introduction

Equipped with hydraulic and chains lifting mechanism, and high strength welding steel frame, high strength aluminum column, single-mast aluminium work platform GTS6KJ08 is intensive. Both of the platform/ground control panels are safety voltage. The double column lift simultaneously, controlled by limit switch, and towed by two chains to ensure safety. It is widely used in indoor and outdoor cleaning activities, such as ceilings, walls, windows, pipelines and exhibition build-up.

Specification

Model

GTS6K11

Size

Max. working height (m)

11

Max. platform height (m)

9.2

Height - stowed (m)

2

Length - stowed (m)

1.37

Width - stowed (m)

0.76

Platform dimension (mm*mm*mm)

660x660x1100

Outrigger footprints (m*m)

2.2x2.0

Machine weight (kg)

330

Performance

Lifting capacity (kg)

100

Power

Electromotor power (kW)

1.5

Electromotor speed (r/min)

1400

AC Voltage (V)

220

Q:The mechanical engineer applies for the condition English to say is must four above, but I did not achieve 4 levels, may have other ways
Mechanical engineer examination, national and local, local is generally relatively simple, the country's more difficult. To get an engineer is one thing, the company is willing to hire you as an engineer, but on the other hand. Even if you pass the exam and get the engineer's certificate, you will not be hired by the enterprise as an engineer. State regulations are 3 years after graduation, you can take an engineer, but some large enterprises are working, 5 years later hired as an engineer.
Q:Ocean Drive Dudes just purchased a new press machinery for $232,000 on December 14, 2010. It is estimated that will last 15 years and has a scrap value of $8,000. You will use this information toprepare the schedules required below. You have to show all details of computations on a year byyear basis to obtain an adequate score. It is estimated That it will last 15 years and has a scrap value of $8,000. Do schedules of sum of the years digits method, double-declining method, and straight line method
Looks like you need to get started on your homework then. Honestly how will you ever learn such a simple thing as depreciation and methods if you do not even attempt to do your work?
Q:During viral R/DNA replication, do viruses take advantage of the cell's ordinary error checking mechanisms?
I think it depends on the virus. Many virus contain their own DNA / RNA polymerases that they use to replicate. Retroviruses for example have reverse transcriptase which synthesizes DNA from RNA, something that is not used by anything else. Not being proofread is what has allowed viruses to thrive, because it causes mutations that host organisms have to adapt to. Notice how there's a new flu shot every year? That's caused by antigenic drift.
Q:I know that varying push ups like spacing your hands further away or putting legs on a higher level works your pecs well. Also I know that dips are good. The problem i'm having is that my left pec is so much smaller and oddly shaped, when I tense, than my right one. I mean what the hell? What can I do to build it up?
without any equiptment you can do it but you are limited, as you stated pushups and dips will help but even dumbells will help significantly so i suggest getting a pair of dumbells you can use to do arnold presss, and chest flies with and chest presses to help your chest build muscle and get lean
Q:How many types of casting machinery?
That isn't even a complete question. Would you like to try again?
Q:i want to make a juice factory particularly for apple juice and i want to know the type of machinery and it cost
Big heavy squishing machines. They cost a lot.
Q:how much do they cost to replace a broken one?thanks..
You can get an exact replacement window from cat but it will be expensive ($300 or more) depending on the size of the window. You can call the local cat house and they will be happy to give you a price, you will need the model and serial number for the parts man to look it up. If it is just broken glass and the gasket and frame are OK you can go to a local glass company and get a new window cut which should save you some money.
Q:What machinery/equipment shall i use for my catering business? I am starting up a business and i cannot find proper help. help me!
Before you start up any business you need to at least find out what is involved in that business. Does that make sense to you? Do you expect to find out the particulars for running a real business like catering here on Yahoo Answers?. Did you know this kind of business involves cooking and serving food for a crowd of people? How can you even think about doing this when you are not even aware of what is needed to cook and serve food. The first piece of equipment you shall use is a functioning brain..
Q:A short extract from the link below: A lawyer for one of the so-called Tapas Nine has confirmed to the Spanish newspaper El Mundo that their client would like to speak further to the Portuguese police but feels reluctant to do so because of Gerry and Kate McCann’s powerful political allies. You can read the rest in:http://www.newsdeskspecial .uk/2007/11/mccann-friend-a.html
Some people may say they have no case against the McCanns.So how come they are still the MAIN SUSPECTS?
Q:Poll: Could the motor from your mouth operate heavy duty machinery; always running?
i have my moments (lol)....i love to chat and at times i babble and ramble on too much and there at times when i have to shut it down!!!! i can't help it....i love to communicate w/others. (smiles)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords