German Type Forged Swivel Scaffold Clamp
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | Material: | |||
Color: | Surface: | Style: | |||
Standard: |
Packaging & Delivery
Packaging Detail: | knitting bag and pallet |
Delivery Detail: | 20-30days |
Specifications
Galvanized Swivel Scaffolding Clamp
Size:48.3mm, Weight: 1.45kg
Surface:electro galvanized, hot dip galvanized
Material:Q235
Forged Galvanized German Type Swivel Scaffolding Clamp
Size:48.3mm, Weight: 1.45kg
Surface:electro galvanized, hot dip galvanized
Item | Forged Galvanized German Type Scaffolding Clamp |
Material | Q235 |
Dimensions | 48.3mm |
Weight | 1.45kg |
Surface | Hot-dip galvanization, electro galvanization ,or as your request |
Standard | EN74,EN74B |
Note | OEM service is available |
MOQ | 1000pieces |
Package | pallet,carton,plywood box, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time
| 20-30days |
- Q:How to maintain the scaffold after use
- Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
- Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q:i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
- I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
- Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
- Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
- Q:Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
- it is umm Ain's comin down til the sun comes down
- Q:would a scaffold piercing look gay on a guy?
- No it would probably look good, but it kind of depends what you look like before you get it. If you want it go for it.
- Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q:Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q:In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
- Because she owes him since she cheated on him.
- Q:What are the functions and requirements of the masonry wall
- 6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
German Type Forged Swivel Scaffold Clamp
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords