Efficient Cantilever Segment Launching Gantry in China
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cantilever segment launching gantry
The launching gantry is used to put the pre-fabricated segment
onto the pre-fabricated pier. It is a kind of crane with the main
function of lifting and transfer the segment to designated
position, but very different from the common crane. It’s more
strict than the common one and can be walked on. Launching
gantry can be divided into several kinds such as launching
gantry for highway, for common railway and for passengerdedicated
line, etc..
◆ Equiped with protection system which guarantee the absolute safety during working. It’s safe, easy
and practical.
◆ Easy installation and removal
◆ Safe & easy operation, easy fixing, and safty during walking
◆ Simple structure, clear big operational space and high efficient.
- Q:Such as Title ah.....I am sorry that the steel structure
- 84798990 commonly used Longmen bridge erecting machine84798990 improved Longmen bridge erecting machine84798990 improved double beam bridge machine84798990 automatic bridge erecting machine84798990 ordinary Longmen bridge erecting machine84798990 common type of double guide beam bridge machine
- Q:The difference between the bridge erecting machine and machine
- Bridge machine is mainly used for large span bridges, each section is divided into many sections together to large degree. The prefabricated bridge machine section hoisting in place, in a cross together, according to the crane, bridge span, and to select the bridging machine, bridge building machine is mainly used for railway box girder construction, when the segment assembly is completed, but also with the bridge machine horizontal wet joint and tension operation after the period of construction, to be later after the completion of construction, only a downward move across. Bridge machine commonly used 40 meters (inclusive) within the T beam, box girder erection, the end of the frame on the line, it moves down a cross, the latter construction and it does not matter.
- Q:When the bridge frame is equipped with T beam, there are power lines above, we do not have the height of the bridge, so I do not know whether the power line to be removed.
- Bridge set top (usually crane) with high voltage line is usually enough 4m (of course, have to look at the views of the electricity sector)
- Q:The difference between double guide beam bridge machine and single beam bridge machine
- Double beam bridge machine:The double guide beam type bridge erecting machine is composed of a double leading beam, a supporting leg, a hanging beam trolley, a moving mechanism, a traversing mechanism and an electric control system. Main beam usually adopts triangle truss, Bailey assembling and box type structure.
- Q:DJ180 bridge machine how to run?
- Safety operation rules for bridge erecting machineThe vertical height of the longitudinal running rail of the bridge erecting machine is corresponding to the height requirement, and is stable. Front, middle and rear legs of the horizontal running track requirements, and strictly control the spacing, the three tracks must be parallel.
- Q:Bridging machine belongs to special equipment
- November 2014, the State Administration of Quality Supervision announced a new revision of the "special equipment directory". Included in the catalog is "bridging machine".
- Q:Detection and quality standard of bridge erecting machine
- Double cantilever girder erecting machineBridge construction machinery, the use of the Soviet Union earlier. In 1948 the introduction of the front and rear arm with steel beam, lifting weight of 45 tons and 80 tons of two kinds. In 50s, the two arms to the framework, lifting to 130 tons.
- Q:How to weld the wet joint of bridge erecting machine
- No requirement for this specification,According to specification
- Q:What are the conventional lifting equipment? Bridge erecting machine is a kind of lifting equipment
- A device that is especially large in weight, or a volume of earth objects, such as lifting the house and moving the equipment. In the hoisting machinery category, there is a market called unconventional lifting equipment, generally refers to the general is lifting the weight or volume of the earth is particularly large, objects, such as lifting and moving equipment housing.
- Q:What is the difference between bridge and gantry crane
- The general idea of installation: 1, laying gantry crane rail (generally the laying), but in the installation must be carried out before the crane on the track before detection, the gauge error is not more than 10 mm; 2, the installation of the cart on both sides of the parallelism, the verticality that can pull round pull line, diagonal, full justice etc. means of correction, (if the cart is not adjusted, rail gnawing will make you a headache to difficult adjustment) 3, lifting the legs together, and the connection, and the cable wind rope, a leg 4 rope hook (after loose ropes fixed rear legs will not pour down)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Efficient Cantilever Segment Launching Gantry in China
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords