Cup Lock Scaffolding with Steel
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Material: | Surface: | Custom Made: | |||
Quality: | Packing: | Delivery Time: |
Packaging & Delivery
Packaging Detail: | Pallets or As Custom's Requirements |
Delivery Detail: | 30 Days |
Specifications
1.Manufacturer
2.Material: Q235 or Q345
3.Surface: Galvanized or HDG or Painted
4.Custom Made: Available
Details
Cuplock Scaffolding
OEM service is available
Scaffolding System: Cup Lock Scaffolding System
Material: Q235 or Q345
Surface: Galvanized or HDG or Painted or Powder Coated
Packing: Pallets or As Custom's Requirements
Delivery Time: 30days
Stable and Durable
A full set of Cup Lock Scaffolding Parts offered
Simple and officient to assemble
Custom Made is available
- Q:The bowl locking conditions of scaffolding, to detect what hand to try, or with what tools?
- Now the general approach is to use artificial eye detection
- Q:What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
- The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role
- Q:what is differences between scaffold and scaffolding?
- Scaffold is what scaffolding is constructed of.
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- Specification for general practical design expressions"Uniform provisions" according to two kinds of components (bending and axial compression) and two load (no combination of wind load and wind load combination) the general practical design formula of scaffolding structure are given, a total of two groups of 4.
- Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from the left end. What is the tension in the left hand side wire?(g = 9.8 m/s2)Answer in newtons
- 85kg. is 42.5kg each cable. 6.4/1.4 = 4.571:1 ratio. Add both sides. (440/5.571) x 4.571 = 361kg. Add the 42.5, = 403.52kg. 403.52 x 9.8 = 3,954.5N tension in left cable.
- Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
- Technical code for safety of steel tubular scaffold with couplers in JGJ130-2011 constructionJGJ128-2010 technical code for safety of steel tubular scaffold for building constructionTechnical code for safety of JGJ202-2010 construction scaffolding
- Q:I just got my scaffold piercing done today and everything went well. I was just wondering how long the healing process would take? Does it vary with different people? And is using sea-salt and warm water the best way to clean it?Cheers x
- Sea salt warm water is the best way to clean it, and the healing time varies from person to person - can be 3 months to 1 year. I have a scaffold too - congrats on the new piercing!
- Q:I got it done MONTHS ago and the bar is so tight on it,i have space in it, like i can move the bar up and down..just i cant get it out and its beginning to hurt me if i sleep on the side its on.. advice please?
- Stop sleeping on it and stop trying to pull it out - you're just going to irritate it doing that. If you feel you need new jewelry, go to your piercer. They can help you out.
- Q:hi there, im looking for scaffolding, is there any one knows a well known name for this service. please hurry up.thanks
- Affix okorder
- Q:Bowl buckle scaffold is not a steel pipe scaffolding
- The steel pipe scaffold is mainly used to connect the steel pipe, the specific method is different
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup Lock Scaffolding with Steel
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords