Scaffolding Formwork Counter Plate
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
color: |
Packaging & Delivery
Packaging Detail: | in bags or as your request |
Delivery Detail: | 30days |
Specifications
1.construction formwork accessories counter plate
2. Surface treatment: galvanized or not
3. Certification:ISO9001
The sizes 105*50mm, 150*50mm, 200*50mm
- Q:Key points for safety of portal scaffolding
- The main points of the safety of portal scaffolding1, scaffold erection must be held by professional Jia Zigong, and according to the current national standard "special operations personnel safety assessment management rules" (GB5036) qualification certificates. Staff should conduct regular physical examination, which is not suitable for high operator, not on the scaffold.
- Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
- 3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
- Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q:...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
- Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
- Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
- Had a hooker climb up the ladder to the 3ed floor one time....didn't stay long though!
- Q:For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
- At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
- Q:What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
- . Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
- Q:What are the dangers of scaffolding
- The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
- Q:Method for inspection of foot hand frame fittings
- Or "low pressure fluid delivery welded steel pipe" GBT 3092
- Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- My industrial was the biggest nightmare piercing I've ever had. I just retired it a few weeks or so ago after waiting for it to heal for 13 months. They usually take between 6 and 12 months to heal. It never healed completely. I got keloids on the inside and outside of both holes and they looked absolutely terrible. I was actually embarrassed when people asked to see my piercing. I couldn't sleep or use the phone or use headphones on that side of my head. Changing the jewelry to titanium only made it worse (and titanium usually does wonders in my piercings). It was the most finicky and miserable piercing I have ever had. Mine was not done with one needle. That is an improper piercing technique. The second hole does hurt like heck, though. Also, don't over-clean it. Twice a day is sufficient. Sea salt soaks are amazing, too!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding Formwork Counter Plate
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords