Self-Climbing Concrete Placing Boom HGB33
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
The placing boom has a Z-shaped boom assembly with three foldable sections, which can swing through 360 degrees while luffing, folding/unfolding, thus allowing it to place concrete to form walls, pipes, columns, piles and other vertical structures without confined placement areas.
The boom assembly’s luffing; folding/unfolding and swinging are carried out hydraulically with buttons. The hydraulic and electrical system feature overload protectors, flow controls, alarms, phase sequence protectors and so on, which ensures the placing boom to have reliable performance, easy and smooth operation, and high safety.
Scope of Application of the Equipment
The HG33A concrete placing boom is a concrete placer for combined use with a concrete pump in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.
This equipment can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The equipment is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.
Transport
Because of the structure of this machine is huge, it needs pay special attention to give the arm adequate stability during the journey. The parts that over-long or over-width need disposal depend on national traffic law. The safety hook should be put up .The arm assembly must be supported by its forward end on a support trestle of adequate load-bearing capacity. In order to avoid oil pipe from extrusion, crosstie under the arms is needed.
In order to transporting conveniently, divide the machine into some big units.
Main Product Features:
· Premium quality
· Prompt delivery & seaworthy packing (10-20 days after receiving deposit)
Reliable performance
Easy and smooth operation
High safety.
· Professional Service
· Competitive pricing
Product Specifications:
Dimensions and masses of the complete machine and its major components
Technical Specifications of the concrete placing boom
Model | HG33A | ||
Delivery pipe dimension (outside diameter×thickness) JJ83(mm×mm) | Φ133×4.5 | ||
Delivery hose dimension (inside diameter×length) (″×mm) | 5″×3000 | ||
Radius of placing boom(m) | 32.44 | ||
Stationary height(to the join between the end of the boom and swivel table) (m) | 22.6 | ||
Four hydraulic foldable arms(m) | 1st section | 9.51 | |
2nd section | 7.56 | ||
3rd section | 7.65 | ||
4th section | 7.72 | ||
Boom articulation(°) | 1st section | 0°~86° | |
2nd section | 0°~180° | ||
3rd section | 0°~180° | ||
4th section | 0°~180° | ||
Slewing range(°) | 360 | ||
Power of motor(kW) | 22 | ||
Pressure of hydraulic system (MPa) | 28 | ||
Type of hydraulic oil | ESSO NUTO H46/H32 | ||
(m)Interval of climbing frame | Climbing | 3.0~4.2 | |
Placing concrete | 6.0~8.4 | ||
Resting | |||
Mode of operation | cable remote control | ||
radio remote control | |||
power | 380V/50Hz | ||
wind speed | Placing concrete | ≤13.8m/s | |
Climbing | ≤7.9m/s | ||
working temperature | -20~48℃ | ||
FAQ:
Q1: How to Erection and Dismantling Placing Boom?
A1: Have the concrete foundation on which the cruciform base is to be erected prepared in accordance with the requirements. Ensure the verticality of the centerline of the cruciform base and level surface less than 1/500. Prepare a private power supply box for concrete placing boom at the worksite. Connect the power supply box with transformer station of the worksite directly using cable.
Q2: what is a General requirement of erecting and dismantling?
A2: The workers who erect or dismantle the equipment must be skilled, familiar with the performance and features of the equipment, and have ability to deal with fault. During erecting or dismantling, all workmen must obey the director's command.
Work off the court neatly, and enclose it with flag-bar, forbid other people come in. Adopting valid precaution prevent workmen from being hurt by falling block. The workmen must wear safety helmet and safety shoes, tie safety belt according to the demand of working at high place. In big thunderstorm, heavy snow, thick fog and the wind speed over 7.9m/s (wind force up to 4) conditions, erecting and dismantling are forbidden.
Before working, check the equipment carefully to clear all the hidden trouble.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce some Concrete Placing Boom according to customers request?
A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
Images:
- Q:what's the difference between the fabric pump and boom pump?
- The spreader is mounted according to the height of the building, and the boom pump can only be used for a lower building
- Q:What is the Hand operated concrete distributor?
- The distributor is reasonable in design, stable and reliable in structure, and adopts 360 degree full swing arm type fabric structure. The whole machine is easy to operate and flexible to rotate. It has the characteristics of high efficiency, energy saving, economy and practicality
- Q:What are the weekly inspection items for concrete spreader?
- Check connection bolts, shaft end plate, pin shaft, lock nut is loose
- Q:What are the specifications of concrete spreader?
- Rotary: rotary, rotary and double rotary bearings; is a kind of new construction machinery and supporting the use of concrete conveying pump tube
- Q:How to fit the cloth rod of the distributor?
- Check whether the bolts of the rod are fully tightened and whether the shaft is normal
- Q:What's the design plan of the concrete spreader?
- Imported cloth machine (tire belt machine) is based on heavy duty truck chassis, or cross-country tire crane as chassis. The distribution machine patent uses the self-propelled crawler crane as the chassis, forming the structure of articulated upper material belt conveyor + crawler chassis + telescopic cloth belt conveyor, which is the first in China
- Q:What are the monthly inspection items of the movable concrete spreader?
- Connecting bolts for solid tower, middle section and revolving table
- Q:What is the working principle of the distributor?
- The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
- Q:What is the difference between concrete pump truck and concrete distributor in construction?
- Pump car and car pump pump, pump transmission range is relatively large, the past can be connected pipe (in pumping pressure permitting), malpractice is relatively heavy, concrete pouring, people need to arrange to remove pipe, guard, pump handle up too much trouble
- Q:What are the acceptance items of concrete spreader?
- Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Self-Climbing Concrete Placing Boom HGB33
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords