• hot dip galvanized steel wire mesh cable tray System 1
  • hot dip galvanized steel wire mesh cable tray System 2
  • hot dip galvanized steel wire mesh cable tray System 3
hot dip galvanized steel wire mesh cable tray

hot dip galvanized steel wire mesh cable tray

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
1000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SS304 Wire Basket Cable Tray:
1. Specialized manufacturer and exporter
2. UL, cUL, CE, IEC, TUV and SGS
3. ISO9001-2008

1. Main Products: Perforated Cable Tray, Cable Trunking, Cable Ladder, Wire Mesh Cable Tray and Strut

Channel.

2. Certificates we have got: UL, cUL, CE, NEMA, IEC, SGS and ISO9001-2008

3. E-Catalog and Samples are available


Product Show:


Packaging & Delivery

Packaging Detail

standard packaging or customized packaging

Delivery Detail

usually within 20 days


Material:
Carbon Steel(Chinese standard steel): Q235B, Q195

Stainless Steel: SS304, SS316 / SS316L

Aluninium/Aluninum

FRP/GRP/Fiberglass


Surface Finish:

Hot Dipped Galvanized – for outdoor use to BS EN 1461-1999, between 60 and 80 microns thick

Electro zinc plated – for indoor use to BS EN 12329-2000

Powder coated - for indoor use to JG/T3045-1998, between 6 and 10 microns thick

Electrolytic Polishing – for stainless steel use

Electro Galvanized

Fire Rated

Specification:

Model

D

W

L

WEIGHT

WB1.5X4X10

1.5''

4''

10'

5.8lbs

...

WB1.5X6X10

1.5''

6''

10'

7.4lbs

...

WB1.5X8X10

1.5''

8''

10'

9lbs

...

:

:

:

:

:

:

:

Sell various kinds of wire mesh cable tray according to the drawing and requirement of customers.

Application:

The electric cable tray system  are widely used for construction projects, such as layingelectrical wire and

cable. Making the lay of the electric wire, electric cable andpipeline achieved the universalized level.

Installation Notice:

Bends, Risers, T Junctions, Crosses & Reducers can be made from wire mesh cable tray straight sections

flexibly in projects.

Trays shall be supported at a maximum span of 2.5m by trapeze, wall, floor or channel mounting methods

and will not exceed maximum loads as specified by the manufacturer.

Wire Mesh Cable Tray systems can be safely employed in places where the temperature ranges between

-40°C and +150°C without any change to their characteristics.


Q:How the spacing of the hangers of the bridge is determined
Cable bridge for lighting and the same purpose of less than or equal to 4 square millimeters of the line with the lighting line quota for power or more than 4 square millimeters of the lighting line applied power line quota
Q:The bridge has a combination of cascade, tray, grid, slot, etc., which in turn with the trough bridge and metal trunking is most similar. And the project cost in the trough and the bridge of the unit price difference of dozens of pieces of one meter, so it is very important to distinguish them ... ... Now a construction team with 200 * 100 slot cable, and some of the floor of the feeder 200 * 100 of the groove with 100 * 50 slot laying. The material of the groove looks like stainless steel, there is no corresponding turn accessories (the term how to call?) Cable or branch line at right angles, between the two slots are not connected to the corresponding hole, the upper and lower cover seal. I ask the money when the "slot" is the price of the bridge to the metal trunking or to the money? More
Every morning to take a bath, do not want to wait, of course, gas or natural gas water heater, (note that natural gas and gas water heater to buy when the points), the most things or ask the next solar water heater manufacturers, the original can install electric tube. If you are used to take a bath, the kitchen and wash basins are not hot water, then mind the direct installation of electricity in the bathroom, direct installation of the pipeline bath, save the pipeline.
Q:Do not use fire blocking material? Question added: commonly used models of fire pack specifications which ah more
First to figure out what the three lines are, if I guess good, it should be a FireWire, a zero line, a switch line. (But how is there no ground?) Come on according to this then L connected to the line of fire, N then zero line, there is a sign of the ground wire. Do not know their own words, do not mess up, called an electrician to pick up better, or easy to accident Oh!
Q:How to lay the multi - layer cable in the trough
What interface do you use? Have you already used a monitor on your computer?
Q:What are the different types of cable trays?
1) cable bridge bottom should be higher than the ground 2.2m and above, the top floor from the building should not be less than 300mm, and beams and other obstacles at the intersection, the distance should not be less than 50mm. 2) cable bridge horizontal laying, the support spacing should be 1.5 ~ 3m. Vertical laying fixed on the building structure on the distance should be less than 2m, 1.8m away from the ground part of the metal cover should be protected, or the use of metal wiring cabinet package, the door should be open. 3) Straight line cable bridge for each more than 15 ~ 30m or across the building deformation joints, should be set to expand the compensation device. 4) When the metal trunking is laid, the bracket or hanger shall be provided in the following cases: at the interval of 3m at each distance; at the distance from the outlet of the trunking at 0.5m; 5) plastic trough groove bottom fixed point spacing should be lm. 6) The cable bridge and cable trunking radius should not be less than the minimum permissible bending radius of the cable in the slot, and the minimum bending radius of the trunking can not be less than 10 times the outer diameter of the thickest cable in the slot. 7) bridge and trunking through the fire wall or floor, the cable after the completion of the deployment should take fire blocking measures.
Q:How to draw the bridge, can directly pull out the four lines composed of the bridge?
Scenario 1: Both voice and data points are terminated with 100 pairs of 110 patch panels, using 1 and 4 pairs of duckbill jumper jumps
Q:Is it necessary to make a flat iron connection in the fire axle
The cross-sectional area of the cable through the embedded pipe is 40%
Q:Electrical engineering bridge; two sets of cable bridge in the same height parallel laying, during which the net distance should be at least the number of centimeters. Thank you hurry
Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
Q:What is the minimum distance between the lighting cable bridge and the weak bridge construction?
5 interface (headphone jack size Ji muscle irrigation can kill Jiu ghost snow Handan grinding) turn 3 lotus interface
Q:Bridge of the jumper no less than the number of square meters, and repeat the ground not less than the number of points
1. How big is the embedding, depending on the cable diameter you are wearing. 2. Wear a few buried a few root, plus a few spare tube. 3. Because the specification has provisions, must wear pipe, in order to prevent lightning and leakage, etc., so that with the body and the building isolated chanting (built and then wear the line, trouble is not it?)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products