• 6T tower crane/ tower crane with CE ISO certificate QTZ63 System 1
  • 6T tower crane/ tower crane with CE ISO certificate QTZ63 System 2
6T tower crane/ tower crane with CE ISO certificate QTZ63

6T tower crane/ tower crane with CE ISO certificate QTZ63

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, QTZ63 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5m to 56m, QTZ63 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of our tower crane:

 

6T tower crane/ tower crane with CE ISO certificate QTZ63

6T tower crane/ tower crane with CE ISO certificate QTZ63

6T tower crane/ tower crane with CE ISO certificate QTZ63

6T tower crane/ tower crane with CE ISO certificate QTZ63

 

Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:crane signals?
they are out there somewhere, and everywhere I have been they are the same
Q:How many meters of cranes should be in accordance with the anemometer?
Tower crane type test items, technical requirements and test methods provides that: Boom root hinge point height of greater than 50m tower crane, should be equipped with anemometer. When the wind speed is greater than the working limit wind speed, the alarm can be issued to stop the operation. The anemometer shall be installed at the top of the tower without the wind.In fact, this is also the requirements of the type test rules for tower cranes and the safety technical specifications for crane overload protection devices.The answer is recommended dogmatism, mainly because the standard setters do not understand the actual situation of the construction, and not the outdoor crane need, need only part of crawler crane and tower crane installation, as the case may be other.Welcome to the emperor student - lifting expert Sina blog, my blog is committed to the dissemination of hoisting safety and professional knowledge.
Q:Can the attached arm of the tower crane be welded?
The attached arm of a tower crane can not be welded and can only be bolted.Adhesion calculation of tower craneTower crane attachment (anchor) device structure, internal force and installation requirements in the use of narrative instructions so in the tower crane installation and use, the use of units can be executed according to the requirements, do not need to calculate, only when the tower crane installation position to the building from the over manual provisions, to increase attached rod (Zhi Chenggan) two, spacing or attached rod connected with a building when changing to attached calculation.
Q:When should a crane be load tested?
if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Q:how to calculate load capacity of crane?
must be sble to left one in half times weight
Q:How would you argue that Helga Crane does change in Quicksand by Nella Larsen?
Helga Crane
Q:Hey i need to know what icabod crane did in sleepy hollow the tim burton version with johnny depp.. so far all i have is In the movie he is a detective or a constable, someone who tries to solve crimes. He stands up for what he believes in even though no one might stand up with him. He used instruments of his own kind. Any information will help..Thank you very much Thx again
He fell in love while there. There were many murders while he was there. He used scientific instruments in a day and age when nobody else did. The town didn't like that about him; they blamed spells and curses. He looked into the crimes when nobody else would. They were too scared. It turns out that it was a headless horseman responsible for the crimes. There were a few witches in the movie.
Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
What is the crane make and model? If you don't have the model of the crane you can stop by almost any hydraulic/hose shop, they should be able to match up the packings.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords