*2018 New PPR Pipe Ftting For Hot Or Cold Water Ckd Solenoid Valve From China Factory

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
100000 pc/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Application: Cold/Hot water supply Place of Origin: China (Mainland) Shape: Regular Round

Product Description:


Specifications:

Standard: ISO
Color: many colors
Application: house and garden
Usage: Family Decoration Industry
Certification: ISO Certificate
Feature: Lightweight
Size: Customized Size
Type: Round
Connection: Butt Fusion


Applications:

1) Cold / hot water supply facilities for public buildings
2) Food, chemical, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of corrosive liquids
3) Drinking water production system pipeline networks; Such as Pure water and mineral water
4) Air conditioning facility pipelines
5) Compressed gas pipeline networks for industry
6) Pipeline networks for swimming pools
7) Pipeline networks for solar energy facilities
8) Agriculture and garden production transporting systems
9) Distribution for cool and hot water
10) Duct for drinkable water system
11) For kinds of high-temperature and low-temperature heating system
12) For heating and cooling settings in solar energy system
13) Connecting pipe for air conditioners


Product Description

Pressure

Size(mm)

Pressure

Size(mm)

 

 

 

 

PN1.25MPA

20*2.0

 

 

 

 

PN1.6MPA

20*2.3

25*2.3

25*2.8

32*2.9

32*3.6

40*3.7

40*4.5

50*4.6

50*5.6

63*5.8

63*7.1

75*6.8

75*8.4

90*8.2

90*10.1

110*10.0

110*12.3


Product Show

*2018 New PPR Pipe Ftting For Hot Or Cold Water Ckd Solenoid Valve From China Factory


*2018 New PPR Pipe Ftting For Hot Or Cold Water Ckd Solenoid Valve From China Factory

*2018 New PPR Pipe Ftting For Hot Or Cold Water Ckd Solenoid Valve From China Factory


Service:

Pre-Sales Service
1. Inquiry and consulting support.
2. Sample testing support.

After-Sales Service
1. Training how to instal the machine, training how to use the machine.
2. Engineers available to service machinery overseas.


FAQ:

1. What other products does okorder offer?
We offer a full range of refractory bricks, mortar, cement, ceramic fiber products, and more
2. Can you offer samples?
Of course, samples are free but freight paid by the buyers.
3. If we don’t have any shipping forwarder in China, could you do this for us?
We have very good relationship with forwarder, we can suggest them to you, and you will get the best shipping price, and have excellent service.
4. How can we get the market information about the popular product?
You can tell us which product you are interested, we will update the hot selling item to you every week.
5. How Can I Get A Sample?
You can get samples by communicate with our export sales.
6. How Long Is Delivery?
Delivery time will be 30-45days according to order quantity.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What quota should plastic tube be fitted?
In the pipeline installation, the plastic flange sleeve quota can be carried out according to the following conditions: installation engineering, plastic pipe installation, plastic flange installation, included in the flange valve
Q:How is the building material, plastic pipe and sewer made? Where are the machines and how much is the selling price?
The plastic pipe used in different fields, they have a common characteristic is the need to withstand the pressure and impact, and in turn, the position, and sometimes need to add metal inserts, the tube wall is generally thicker, so when the injection molding production, attention must be paid to the quality of plastic plastic the temperature, pressure, and (especially the two pressure holding time long) control, speed, special machine Chun's existing UPVC, SPVC, PP-R and PE special screw, machine fittings special emission maximum (National injection amount of 43 kg, a clamping force of 2000 tons), to ensure the plasticizing quality of different plastics, in the room (such as Liansu, Gu and other companies) in the process of using well. Below to PP-R pipe production, for example, to explain the specific characteristics of the process: (1) PP-R raw material properties: raw materials generally do not need drying.
Q:ABS, rubber, resin, pipe made of three kinds of material. Which kind of hardness, electricity, heat insulation is good?. Can that material be used as tubing and heating fittings?
ABS, rubber, resin, pipe made of three kinds of material. Which kind of hardness, electricity, heat insulation is good?. Can that material be used as tubing and heating fittings?
Q:Are the elbow and three - pipe fittings installed in the water supply and drainage pipes included?
This needs to consider the pipeline material, under normal circumstances, the steel pipe welding connection, the thread connection, the plastic pipe plug connection (mainly for the PVC pipe) are not calculated pipe fittings, included in the quota;The following pipes need to be individually calculated:1, steel pipe groove or flange connection, need to calculate groove pipe fittings, flange piece;
Q:May I ask whether the steel mesh skeleton plastic composite pipe can be installed as the same PE
The connection with hot melt connection and flange connection in two ways (Figure 1, figure 2 for welding connection flange connection), electric melting connection is a composite pipe socket to electric heating tube, the heating wires embedded in the surface of pipe fittingWith 220 V + 2 V voltage current to make it hot, first make the inner surface of the pipe melt to produce melt, melt expansion and filled with pipe and pipe gap, until the pipe surface also produces melt, two kinds of fusion in oneThe pipe and the pipe fittings are tightly connected as a whole after the cooling is formed.
Q:About plastic drain pipe expansion joint?
The setting of the expansion joint of the transverse pipe is that the transverse branch pipe and the transverse dry pipe are connected without the confluence pipe and are connected with the vertical pipe. When the length of the pipe section is larger than 2.2M, the expansion joint is arranged at the side of the cross pipe near the confluence pipe. When the drainage tube is arranged in the inner tube, setting expansion joints in the lateral wall near the well. The other side of the expansion joint of the transverse pipe should be provided with a fixed support.
Q:Antistatic flame retardant PE plastic pipe installation, what should pay attention to?
The special rubber sealing ring is coated with lubricant and put into the pipe slot, and the pipe is inserted directly into the pipe to the second mark.
Q:What causes plastic pipes and fittings to burst easily?
Generally, there are dimension indexes, inner diameter, outer diameter and wall thickness.Strength index, pipe strength indicators have radial compressive strength, that is, ring stiffness, flexibility index, bending index, impact strength, etc.For drinking water pipes, there are technical aspects of health indicators, as well as water pressure indicators.For the communications industry, there are other technical requirements.
Q:What is the difference between plastic pipe fittings and hot melt plastic water supply pipe fittings?
PSP is the abbreviation of steel plastic composite pressure pipe, P is PE or PPR, PERT and other materials should be the initial letter, S steel English letter referred to, as the name suggests PSP is sandwiched between two layers of plastic steel, with the aim of internal and external corrosion types, such products generally have high water to melt connection pipeline, inside and outside the plastic pipe with the use of fire, underground pipeline steel mesh skeleton.
Q:Water supply and drainage, fire pipeline installation, pipe installation has been included in the quota, if adding the elbow, three links should be the cost of materials, in which the items below?
If the installation fee does not include the words can refer to sixth copies of the quota items corresponding process approach.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range