15 Meters Electric Type Concrete Placing Boom

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

15 Meters Type Electric Concrete Placing Boom

1.  Structure of 15 Meters Type Electric Concrete Placing Boom

Electric Concrete Placing Boom is newly designed product in order to expand the scope of concrete pouring and improve the mechanization level of pump conveying.

This Manual Concrete Placing Boom with its two fold arms in level folding way are adopted by the boom which is 360° with the characteristics of manual operation, flexible, convenient, safe and reliable.  

The clear height of this machine is 5 m, and particularly applicable to occasions such as the wall, columns with the steel set prominent.

Lightweight, move flexible, and with the mobile place for tower crane to move conveniently.


2.  Main Features of 15 Meters Type Electric Concrete Placing Boom

• Frame arm structure, increasing the loading capacity and stability.

• It has the advantages of high efficiency, energy saving, economy, practicality.

• Double supporting leg, improve the stability and bearing capacity of double

• With excellent steel GB, the Firmness is enhanced several times compared to angle iron

• Electric concrete pouring boom effectively solves the difficulty in wall pouring and successfully reduces labor intensity.

• It has reasonable design, stable and reliable structure. With 360 degree rotation and arm fabric structure, the machine has the advantages of simple operation, flexible rotation.


3.  15 Meters Manual Concrete Placing Boom Images



15 Meters Electric Type Concrete Placing Boom

15 Meters Electric Type Concrete Placing Boom

15 Meters Electric Type Concrete Placing Boom

4. 15 Meters Electric Type Concrete Placing Boom Specification

15 Meters Electric Type Concrete Placing Boom



5. FAQ

We have organized several common questions for our clients,may help you sincerely:

Is your products exported a lot

We have exported to many, many countries. Every year we ship more than 30 containers of these machines & spare parts for it. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to fit the cloth rod of the distributor?
With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
Q:What is the concrete distributor?
Concrete distributor is the end of pumping concrete, the function is to pump the pressure of concrete sent through the pipe to the casting components of the template
Q:What are the weekly inspection items for concrete spreader?
The conveying straight pipe and the 90 degree bent pipe on the rack shall be rotated 180 degrees after the completion of a certain amount of transportation so as to increase the service life.
Q:What's the design plan of the concrete spreader?
This design makes the cloth machine walking can be designed like the cloth machine when walking will be required to drag on the tape machine in the tail walking without disassembly will drag on the tape machine in the tail walking without disassembly, or will carry on the tape machine walking in fabric tape machine. The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes.
Q:What is the difference between concrete pump truck and concrete distributor in construction?
Automobile pump flexible tubing can flexibly rotate 360 degrees, the body shift is also very convenient, the pumping efficiency is relatively high, but the cost is more expensive.
Q:How to distinguish tower type distributor and general distributor?
Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
Q:What is the Hand operated concrete distributor?
It effectively solves the problem of pouring material into the wall, and plays an important role in improving the construction efficiency and reducing the labor intensity
Q:What are the acceptance items of concrete spreader?
Have product quality certificate, construction site cloth machine is reinforced
Q:How to maintain the concrete spreader?
The lining of the silo is equipped with abrasion less material lining board to reduce material adhesion and reduce material arching
Q:What are the benefits of concrete handling machines?
The construction area of the crane pipe can not be reached, and the concrete distributor can be used instead

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range