1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our products:

Condition: New

Brand Name: AOLITE

Model Number: 926FZ

Place of Origin: Shandong, China (Mainland)

Type: Front Loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):5620*1900*2800mm

Rated Load: 1200kg

Certification: CE, ROPS/FOPS

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Color: yellow,black ,as you like


Main feature of our products:

1.Installation Services

Installation Services are available with all new machine purchases. We will provide the technical know-how for your operation smooth transition and support for installing, debugging, operation of the machine, it will indicate you how to use this machine well.

2.After Sales Service


We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.


Specifications of our products:

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader

1.2tT Mini Wheel Loader for Sale with CE/926FZ Wheel Loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:PHYSICS HELP PLEASE! grade 11 THANK YOU?
You can solve this problem using kinematics equations, but I think conservation of energy is fewer steps and simpler math: First, find the force due to friction (g*m*coef) 9.81 * 570 * 0.76 = 4250 N Next, find the total kinetic energy imparted to the block after it has moved (0.5*m*v^2) 0.5*570*0.84^2 = 201J Finally, plug this into the work=force*distance equation, remembering that the net force will be the force of the bulldozer minus the frictional force: (Fdozer - 4250) * 1.26 = 201 Solve for Fdozer F=4410 N
Q:tell me advantages and disadvantages using heavy machines like bulldozer,catapiller?
Depends on the job ur doing. And wat equipment u need and how much money u have
Q:How long is the shadow of a bulldozer?
depends on the time of day... or how hight the sun is in the sky id go for 4meters at a guess though no shadow at midday... biiig shadow at sunset/sunrise
Q:What are the variants of AMD bulldozer available for sale right now..and what are their clock speeds and price?
There are no bulldozers available on the market yet,they havent been released. release date has been pushed back to october 12 (rumoured)
Q:How long does it take to take out a cylinder of a bulldozer?
Which cylinder? A hydraulic for the blade or the rear PTO? One from the engine? Need more specifics. One of the blade hydraulics is not that long considering it is exposed and on the outside of the machine. Disconnect the hyd lines and undo the bolts and presto it comes off. Then disassemble cylinder and rebuild. So about an hour or a little more for such and the same for rebuild and then reassemble. For the engine a bit more time as getting in and such is not as easy. The Cat or other heavy equipment repair centre will be able to give you farly accurate times for such.
Q:Hebei Xuangong has what kind of bulldozer? Which is cost-effective?
Xuangong has high driving bulldozers, bulldozers, bulldozers, the sanitation standard of wetland bulldozers, coal pusher and so on, each type corresponds to several bulldozers, you or your choice according to the requirement of the project.
Q:if you had a catapillar tractor type bulldozer thing - what would you do with it?
WTf you talking about?
Q:which gaming processor should I use?
Get the i5-2500K, no Assdozer will ever be better than i5-2500K or i7-2600K
Q:What are the wheels on a bulldozer called?
Because the general population doesn't know the difference and they are too lazy to figure it out themselves. My fiance' is a Heavy Equipment Operator, and even I don't know the difference. They have more important things to worry about anyways, like brainwashing the public.
Q:Intel i5 2500k or AMD fx 8120 bulldozer?
Right, most people will tell you the i5-2500k, personally i don't agree(as i have the fx-8120 and love it). fx has 8 cores 2500k has 4 cores both have 8 threads due to the 2500k has hyper threading(although the 4 hyper threaded cores only really adds up to 1 full core...) both have relatively easy overclocking (although the 8120 is very very very easy) Personally i would recommend the FX-8120 as it is altogether a cheaper platform(motherboard and processor) than the i5-2500K and to be honest that puts the FX-8120 competing with the 2400 or worse, making the bulldozer great in comparison. If you don't mind spending more then the i5-2500K is great for gaming currently, but once games start to utilize more cores the FX-8120 will begin to push its weight. Also Microsoft have recently launched a 'hotfix' for the bulldozer which has increased its performance between 15-30%. One person who has it managed to get a cinebench result of 7.64 which, compared to the origional score of 5.64, is very good. Hope i have helped !!!!! :P

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range