Bridge Formwork Systems

Building bridge tunnel formwork
Building bridge tunnel formwork
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
Bridge Formwork system
Bridge Formwork system
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
Building Bridge Tunnel formwork
Building Bridge Tunnel formwork
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
Bridge formwork system
Bridge formwork system
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
Auto-Hydraulic climbing formwork-bridge
Auto-Hydraulic climbing formwork-bridge
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
Bridge Formwork System for Building Construction
Bridge Formwork System for Building Construction
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Building Bridge Tunnel Formwork and scaffolding system
Building Bridge Tunnel Formwork and scaffolding system
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
timber beam CONSTRUCTION FORMWORK SYSTEMS
timber beam CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Auto-Climbing Formwork from High Bridge Construction
Auto-Climbing Formwork from High Bridge Construction
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 500000 m²/month
Cantilever Formwork for Buildings and Bridge
Cantilever Formwork for Buildings and Bridge
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 100000 m²/month
CONSTRUCTION Aluminum-Frame FORMWORK SYSTEMS
CONSTRUCTION Aluminum-Frame FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Wholly Aluminum Formwork System for Bridge Construction
Wholly Aluminum Formwork System for Bridge Construction
Ref Price: Get Latest Price
Min Order Qty: 1000 m²
Supply Capability: 8000 m²/month
Bridge Formwork System and scaffolding system
Bridge Formwork System and scaffolding system
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
TIMBER BEAM CONSTRUCTION FORMWORK SYSTEMS
TIMBER BEAM CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Auto-Climbing Formwork of CONSTRUCTION FORMWORK SYSTEMS
Auto-Climbing Formwork of CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork
CONSTRUCTION FORMWORK SYSTEMS and Aluminum-Frame Formwork
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Protection Platform  for Formwork and Scaffolding systems
Protection Platform for Formwork and Scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
CONSTRUCTION FORMWORK SYSTEMS of Timber Beam Formwork
CONSTRUCTION FORMWORK SYSTEMS of Timber Beam Formwork
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Protection Platform  for Formwork and Scaffolding  Systems
Protection Platform for Formwork and Scaffolding Systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Climbing Bracket for formwork and scaffolding systems
Climbing Bracket for formwork and scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Climbing Bracket for Formwork and Scaffolding Systems
Climbing Bracket for Formwork and Scaffolding Systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Tower scaffolding for formwork and scaffolding systems
Tower scaffolding for formwork and scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Steel-Frame Formwork FOR CONSTRUCTION FORMWORK SYSTEMS
Steel-Frame Formwork FOR CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Whole Aluminum Formwork IN CONSTRUCTION FORMWORK SYSTEMS
Whole Aluminum Formwork IN CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION
WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION
Ref Price: Get Latest Price
Min Order Qty: 120 m²
Supply Capability: 10000000 m²/month
Timer Beam FORMWORK SYSTEMS for Concrete
Timer Beam FORMWORK SYSTEMS for Concrete
Ref Price: Get Latest Price
Min Order Qty: 1 pc
Supply Capability: 10000000 pc/month
Timber-Beam  for formwork and scaffolding systems
Timber-Beam for formwork and scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Auto-Hydraulic  formwork for bridge construction
Auto-Hydraulic formwork for bridge construction
Ref Price: Get Latest Price
Min Order Qty: -
Supply Capability: -
CONSTRUCTION FORMWORK SYSTEMS OF Aluminum-Frame Formwork
CONSTRUCTION FORMWORK SYSTEMS OF Aluminum-Frame Formwork
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Protection-Platform for Formwork and scaffolding systems
Protection-Platform for Formwork and scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Tabel formwork for Formwork and Scaffolding Systems
Tabel formwork for Formwork and Scaffolding Systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Tower scaffolding  for formwork and scaffolding systems
Tower scaffolding for formwork and scaffolding systems
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
CONSTRUCTION FORMWORK SYSTEMS  of Steel-Frame Formwork
CONSTRUCTION FORMWORK SYSTEMS of Steel-Frame Formwork
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Table Formwork of  CONSTRUCTION FORMWORK SYSTEMS
Table Formwork of CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month
Plywood formwork systems for formwork and scaffolding
Plywood formwork systems for formwork and scaffolding
Ref Price: Get Latest Price
Min Order Qty: 50 m²
Supply Capability: 1000 m²/month
Whole Steel Formwork Used in CONSTRUCTION FORMWORK SYSTEMS
Whole Steel Formwork Used in CONSTRUCTION FORMWORK SYSTEMS
Ref Price: Get Latest Price
Min Order Qty: 1 m²
Supply Capability: 10000000 m²/month

Bridge Formwork Systems Related Searches

Hot Searches

Bridge Formwork Systems Supplier & Manufacturer from China

Okorder.com is a professional Bridge Formwork Systems supplier & manufacturer, offers integrated one-stop services including real-time quoting and online cargo tracking. We are funded by CNBM Group, a Fortune 500 enterprise and the largest Bridge Formwork Systems firm in China.

Hot Products

FAQ

What is the role of the grid steel frame and steel mesh in the power tunnel
Advanced small pipe grouting small catheter with a diameter of 32-50mm steel pipe, the pipe tip and tube holes for special processing. The first row with drill drilling pipe. Row spacing is 30cm, fan shape, elevation of 5 degrees to about 8 degrees. The length is 2.25m, a single fluid grouting (cement) or double grout (cement water glass slurry). Adjust the grouting pressure according to the soil.s
Tunnel construction technology and method
5) the construction of open cut tunnel reinforced concrete structure construction is divided into two parts: first, the construction of inverted arch and wall foundation of reinforced concrete, to be part of the concrete reaches certain strength, stripping, cutting hair construction joints, and construction of the upper side wall and arch of reinforced concrete. The inverted arch and wall part of the composite steel formwork, artificial pouring, side wall and arch concrete construction formwork for the internal mold, and molded with combined steel formwork, formwork and external bracing to ensure stable, symmetrical pouring concrete, steel processing plant in processing molding, binding site. The concrete is produced by the automatic metering concrete mixing station, the concrete transport vehicle transportation, the concrete pump into the mold, the insertion type tamping device is compacted, and the arch wall concrete is completed once.6) water proof construction, laying waterproof layer, tunnel construction on the surface of concrete repair chisel flat uneven place to prevent damage of waterproof board. The weld quality of the waterproof board shall meet the requirements. If there is any defect, corrective action must be taken to meet the requirements.7) arch backfilling: Myeongdong vault above maximum backfill height 2m, compaction degree '93% fill in the top-level clay layer of water, the backfill surface of turf.Back fill both sides of the symmetry at the same time, the bottom of the wall filled with 0.5m ~ 1m thick gravel and compacted, and then the use of artificial layered backfill, layer by layer compaction. Careful protection of the waterproof layer during backfilling is not destroyed.The water layer of clay and the side, the slope of the lap is good, close to prevent surface water leakage.s
What is the simple calculation method of the tunnel excavation unit price
Comprehensive unit price = labor cost + material equipment fee + mechanical + management fee + profits
How to set the location of the tunnel trolley,
The next two large positioning along the side mode, re positioning of two small side mode along the point, then turn to check the center point and elevation, if not the positioning deviation is complete, then re adjust the positioning deviation! If you have time to measure the location of the site can be set up, then you do not nail this method, the five points directly to the elevation and mileage can be controlled for a long times
How the tunnel template is calculated
The construction specification requires that the main hole should adopt the full section lining formwork trolley, and the other cars can be connected, the man and the equipment can be assembled.At present, the construction of the tunnel in our country basically uses the steel formwork trolley, many provinces and cities have set the minimum thickness of the template.s
How to calculate the lining formwork trolley in tunnel construction
In the construction of the tunnel lining template can belong to the low value consumables in accounting, purchasing back into low value, and share in the future cost of 50%, scrap reamortization into 50% of the cost of this method is of low value consumables 55 amortization method; fixed assets, equipment car belonging to the class the asset depreciation period of 10 years. The lining template trolley for a device, rather than separate accounting, and the template should be turnover materials? Added: I engaged in casting model in the low value consumable, car is of course equipment assets added: template is a collar with the repeated use of the low value consumables, which belongs to the class of tools, you can also be classified as turnover materials, but according to the use of reasonable cost sharing principle after ask: you the manufacture of accounting, and it is in the tunnel construction, the construction enterprise to buy trolley. I personally feel that the template should be separated from the car accounting, so more true and accurate. Thank yous
On the interpretation of the specialized words in tunnel
Bias: refers to the formation of the tunnel, resulting in uneven pressure. To provide you with a few books you go to see the explanation. The site is easy to understand.s
I would like to ask the tunnel step method excavation, the height of each step is how to divide?
On the circular arc heading cutting method, the excavation of each cyclicfootage and steel frame with same interval, after the excavation will be used in the initial support, the excavation behind the steps of 8~10m, after the excavation construction of initial support and invert, and then the middle rock pillar grouting reinforcement. (4) of excavation the surrounding rock and the surrounding rock in deep buried section IV and supporting: IV rock by step excavation method, step up the steps behind 8~10m, up and down the steps of primary support construction must follow with the excavation. Rock class take the whole section excavation method. (5) are the simple types of rock excavation self assembling drilling trolley, with dump truck shipment mucking loader. In order to ensure the safety and stability of tunnel construction in soft rock section, the construction must follow the "weak blasting, little disturbance, short excavation, strong support and frequent measurement, tight lining", in the application of The following measures shall be takens

Hot Articles

Have you ever heard of plasterboard ceiling fixings
Have you ever heard of plasterboard ceiling fixings?If not and if you are looking for a good plasterboard fixing manufacture,here is the one I am going to recommend to you. RJ part...
What are composite doors
As the name implies, the composite door is made of two or more than two kinds of main materials. What are composite doors? How to choose the appropriate composite door? What is the...
what is the difference between granite and marble
Granite and marble are commone stone in our daily life, whether it is luster or texture,they are rare good stone.But what is the difference between granite and marble?Let me take...
what is the difference between quartz and granite
What is the difference between quartz and granite?The quartz stone is made of quartz and resin.The hardness reaches 7 degrees, while the granite is composed of marble powder and ...
What's Composite panel association
The Composite Panel Association (CPA) is the North American Trade Association for manufacturers of particleboard (PB), medium density fiberboard (MDF), and other compatible product...