ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Ref Price:
$200,000.00 - 500,000.00 / unit
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 ZYC series multi-functional Hydraulic Static Pile Driver 


ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Features

Main product: ZYC series multi-functional Hydraulic Static Pile Driver Self-developed with 5 up-to-date patents.

The working principle is using hydraulic pressure to clamp precasted pile, H shape or other shape steel pile, and then driving the pile into ground by hydraulic pressing.

Suitable for piling precast round & square concrete pile, H shape steel pile and other irregular-shaped pile in clay, soft soil and sandy ground.

It has characteristics of no noise, no vibration, no pollution, clear ground with high speed of pile driving, reliable construction quality and environmental protection, high efficiency, energy saving. It is welcomed by the customers with wide market prospect.

ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Flexible connection technology

Novel flexible connection technology of central axis, won national practical patent 

ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Multi-functional piling technology

Original combination clamping piling and top piling won invention patent


ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Inverted cylingder technology

Structure design of inverted cylinder changes strained condition of cylinder and increases the service life of cylinder, won national practical patent


ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver

Integrative side and corner piling technology

Particular side and corner piling mechanism increasing the capability of side & corner piling and won national practical patent 

ZYC series ZYC900B multi-functional Hydraulic Static Pile Driver


Self-adaptive clamping mechanism

Original self-adaptive clamping mechanism won national practical patent 


Parameters:

Rated piling pressure(tf)900suitable pile & specification(mm)

¢400-800

Max. Piling speed(m/min)7.0Max. Crane lifting weight(t)20
Piling stroke(m)1.8Hanging pile length(m)15
Max. Longitudinal pace(m)3.6Minimum side piling space(mm)/
Max. Transverse pace(m)0.6Minimum corner piling space(mm)/
Max. Rise stroke(m)1.1Intensity of pressure(tf/m²)15.5/20.0
Max.rotation angle per time(°)8Weight composition(t) Machine weight200±3
Rated hydraulic system pressure(mpa)25(20)Added water weight(t)50
Hydraulic Pump (Unit × Ml/Turn)3×125 + 1×80Counter weight(t)650
Motor power (Unit × kw)

3×37 + 1×37

Total weight(t) ≥900


FAQ

To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.

Before sales

Research market with customers; provide technical advice, customized design and production.

 

On sales

Always communicate and adjust of design with customer to ensure the product satisfy all requirements.

 

After sales

Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.

 

Value added services

Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.

Provide high quality and lower price components.

Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is there an operation certificate for percussive drill driver?
at the top of the main frame is fixedly connected with the pulley first, the lower part is provided with a steering pulley, the pulley head and a steering pulley connected by wire rope transmission; one end of the wire rope is fixedly connected with the hammer, the other end is connected to a winch Part; the manipulation of PLC electric control box, automatic operation mechanism began to work, you can control the opening and closing part of piling winch clutch, the automatic impact drill piling machine has the advantages of simple structure, low cost, convenient operation, reliable performance.
Q:Piling of percussive drilling
7, the drilling process control should be rigorous, but also do not have to worry about failure, a reasonable choice of treatment methods, generally can be solved, the common, foot blade perforation, hole collapse, partial hole, cross hole, drilling, drilling, drilling buried crane, well preventive measures are generally not in advance, very important duty responsibility. 8, the remaining holes, steel cage decentralization, concrete pouring, sealing and other are more conventional, do not write more. But the bottom of the hole, sediment, sediment, etc. must be recycled clean, otherwise it will be buried in the later works of greater risk. When the concrete is poured, the bottom concrete under the impact of residue inclusion in steel or bond caused by defects in the pile in concrete, on the upper structure of the load transfer to the bottom of the pile, the structure will definitely should produce uneven settlement for residue.
Q:Is it better to build a foundation or a separate column?
Depends on geological reports, can not pile, it is best to save a lot of money Oh!
Q:What role does piling play in buildings?
There are many kinds of piles, such as powder jet pile, which is the foundation pit support; the engineering pile is to improve the bearing capacity of the foundation............The depth of pile driving is related to many factors, such as underground bearing stratum and ground loadThe principle of hydraulic pile is simply to press the pile into the ground by hydraulic principle
Q:How much is a pile driver for a building?
The pile foundation of high-rise building usually adopts precast pipe pile and seldom uses cast-in-place pile. The precast pipe pile is mostly driven by diesel hammer pile machine (in particular, the use of static pressure pile machine).Diesel hammer pile machine imports (mostly self-propelled) and domestic two categories, according to pile hammer points from 1T to 8T range; the corresponding price is very different, domestic about 40-80. Imports of more than one million.
Q:What's the effect of Engineering piling?
Provide the foundation with carrying capacity. Figuratively speaking: you want to select a piece of land, build a house on it, but the soil is not good, if the house made above may sink may also occur uneven settlement drained, it is necessary to carry out treatment on the site, a lot of processing method, which is a kind of pile.
Q:How many meters can a small pile driver reach?
Hello! A square bar in Hunan wylong machinery is probably less than 20 no problem.
Q:Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
The pile driver can be placed alongside or extended to 2 or 3 meters.
Q:AMD pile driver FX-8350 with what motherboard good?
AMD 8350, the motherboard recommended using 990X and 990FX, so that CPU can play a good performance.Can be said to be the king of the game. Graphics card or 7870 of the bar, two of the game graphics do not mistake.
Q:What are the effects of building piling on the surrounding area?
The best co-ordination, not to consult the Construction Planning Bureau

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range