ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Ref Price:
$200,000.00 - 500,000.00 / unit
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 ZYC series multi-functional Hydraulic Static Pile Driver 


ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Features

Main product: ZYC series multi-functional Hydraulic Static Pile Driver Self-developed with 5 up-to-date patents.

The working principle is using hydraulic pressure to clamp precasted pile, H shape or other shape steel pile, and then driving the pile into ground by hydraulic pressing.

Suitable for piling precast round & square concrete pile, H shape steel pile and other irregular-shaped pile in clay, soft soil and sandy ground.

It has characteristics of no noise, no vibration, no pollution, clear ground with high speed of pile driving, reliable construction quality and environmental protection, high efficiency, energy saving. It is welcomed by the customers with wide market prospect.

ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Flexible connection technology

Novel flexible connection technology of central axis, won national practical patent 

ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Multi-functional piling technology

Original combination clamping piling and top piling won invention patent


ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Inverted cylingder technology

Structure design of inverted cylinder changes strained condition of cylinder and increases the service life of cylinder, won national practical patent


ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver

Integrative side and corner piling technology

Particular side and corner piling mechanism increasing the capability of side & corner piling and won national practical patent 

ZYC series ZYC600B multi-functional Hydraulic Static Pile Driver


Self-adaptive clamping mechanism

Original self-adaptive clamping mechanism won national practical patent 


Parameters:

Rated piling pressure(tf)600suitable pile & specification(mm)¢300-800
Max. Piling speed(m/min)5.9Max. Crane lifting weight(t)16
Piling stroke(m)2.0Hanging pile length(m)15
Max. Longitudinal pace(m)3.6Minimum side piling space(mm)/
Max. Transverse pace(m)0.6Minimum corner piling space(mm)/
Max. Rise stroke(m)1.1Intensity of pressure(tf/m²)12.96/16.6
Max.rotation angle per time(°)11°Weight composition(t) Machine weight164±3
Rated hydraulic system pressure(mpa)24(20)Added water weight(t)46
Hydraulic Pump (Unit × Ml/Turn)3×80 + 1×80Counter weight(t)390
Motor power (Unit × kw)3×37 + 1×30Total weight(t) ≥600


FAQ

To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.

Before sales

Research market with customers; provide technical advice, customized design and production.

 

On sales

Always communicate and adjust of design with customer to ensure the product satisfy all requirements.

 

After sales

Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.

 

Value added services

Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.

Provide high quality and lower price components.

Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the strategy for building industry users to supply machinery,
Promote。 As for Chinese chopsticks, fork to foreigners, the Xu
Q:What are the prospects for a small pile driver and a foundation pile driver? Will it make money?
like Hunan Huilong piling machine is generally divided into: Machine lock rod rotary drilling rig, caterpillar rotary drilling rig, crawler wheel screw drilling machine, rotary drilling rig.
Q:How much is a pile driver for a building?
The pile foundation of high-rise building usually adopts prefabricated pipe pile and seldom uses cast-in-place pile, but the prefabricated pipe pile uses the diesel hammer pile machine to pile (specially use static pressure pile machine)Diesel hammer pile machine imports (mostly self-propelled) and domestic two categories, according to pile hammer points from 1T to 8T range; the corresponding price is very different, domestic about 40-80 in. Imports of more than one million
Q:How to safely operate a pile driver?
(6) the diesel hammer hammer machine must adjust the amount of fuel supplied to control the height of the drop hammer, and must stop hammering when the second piston ring of the upper piston is seen.(7) diesel hammer pile machine, the end of the piling operation, the cylinder should be placed on the piston seat. The application of timber pile hammer pad or pin lock.(8) when the pile is driven by vibration, no one is allowed to stay in the lower part of the frame. When pulling out the vibration, it should be vertical upward and pull out at the same time.(9) the construction site of the static pile driver shall be flat and compacted, with a slope of no more than 3%, without any water accumulation, and no underground burial shall be confirmed.
Q:What kind of industry can use a pile driver?
The steel pipe pile can be driven into or pulled out according to different configurations or drilled on the subgrade and stabilizing layer before piling.Drop hammer pile driver is a pile tube drop device has simple design, convenient installation and transportation, strike force, stable performance characteristics is a heavy piece of steel, by using the hook lifting winch, after decoupling along the guide frame free fall and piling. All use of electric power, without the purchase of expensive diesel power.Hammer piling machine is composed by hammer hammer and the hammer seat, with steam or compressed air as a driving force, a single action and double action two hammer hammer. With steam or compressed air as a driving force, a single action and double action two hammer hammer. Single acting piston or cylinder as the hammer to hammer, steam driven hammer up, then let the hammer seat along the guide rod fall and piling.
Q:Mechanical piling machine about how much money?
Hello, impact pile driver, down fourteen, fifty thousand! I am the engine hand. Contact me if you need me! I can also give you a staff officer for a rig
Q:How many types of piles are there in the site?
(3) screw in pile;The screw in pile is a spiral plate at the end of the pile, which is gradually transferred into the foundation by the torsion of the external machinery. The cross section of the pile is generally small, but the spiral plate is relatively large, and the disturbance of the pile side soil is larger during the construction of the spiral pile, so the screw plate of the pile head bears the axial pressure or tensile force of the pile.(4) vibration sinking pile;The vibration sinking pile is the vibrating sinking pile, and the precast pile is sunk into the ground by the vibration and vibration action of the vibrating pile driving machine. This method of construction is basically between the method of penetration and the method of pressing in.
Q:In the construction project, the pile driver can not be reached. What should the supervisor do?
Stop. Check cause. Geological prospecting and prospecting
Q:Pile foundation
Sinking pile foundation pile, cast-in-place pile is the reinforced concrete or steel pipe pile tip with valve pile tip at the bottom of the sleeve, sinking to the required depth by hammering or vibration, the tube placed inside the reinforcement cage, concrete pouring, pull out pipe forming. Bored pile foundation construction - long spiral drilling bored pile construction, the main processes are: site preparation, the laying of protective cylinders, preparation of mud, drilling, cleaning, reinforcement cage, into the hole and pouring underwater concrete. The key is drilling, the main methods are: rotating method, impact method and punching method. The rotary drilling can be divided into positive revolving drilling, reverse circulation rotary drilling, long spiral drilling machine and so on. Bored pile foundation construction - reverse and reverse rotating drilling, positive rotation drilling: mud from the mud pump at high pressure from the mud tank into the bore of the drill pipe, the drill hole through the mouth of the injection.
Q:Why should the pile foundation be excavated after the pile driving?
The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range