TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technical Sheet for TC7032
Free standing height (m) | 52.4 | ||||
Max height with attachment (m) | 199.4 | ||||
Working range can be adjusted (m) | 30、35、40、45、50、55、60、65、70 | ||||
Working range (m) | 4.3-70 | ||||
Max lifting capacity (t) | 12 | ||||
Tip load @ 70m (t) | 3.2 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity (t) | 0-3 | 0-6 | 0-6 | 0-12 | |
Speed (m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | 70RCS30 70hp / 75LVF30 75hp | ||||
Trolleying mechanism | Speed (m/min) | 15-50(12t) -100(6t) | |||
Motor | 6D3V4 6hp | ||||
Slewing mechanism | Speed (r/min) | 0-0.7 | |||
Motor | rvf162 2X7.5hp | ||||
Climbing speed (m/min) | 0.5 | ||||
Counterweight (t) | 26 | ||||
Mast section size (L×W×H)m | 2×2×3 ( panel mast type ) | ||||
Working temperature | -20-+40℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading Chart
70mJib Length:
R(m) | 2.5- 23.92m | 25 | 30 | 35 | 40 | 45 | 50 | 55 | 60 | 65 | 70 |
a=2 (t) | 6t---42.35m | 5.75 | 5.33 | 4.75 | 4.09 | 3.71 | 3.20 | ||||
a=4 (t) | 12t | 11.4 | 9.18 | 7.62 | 6.45 | 5.25 | 4.83 | 4.25 | 3.59 | 3.2 | 2.45 |
65mJib Length:
R (m) | 2.5- 25m | 30 | 35 | 40 | 45 | 50 | 55 | 60 | 65 |
a=2 (t) | 6t---47.4m | 5.6 | 5.02 | 4.51 | 3.1 | ||||
a=4 (t) | 12t | 9.68 | 8.05 | 6.83 | 5.88 | 5.13 | 4.52 | 4.1 | 4.1 |
60mJib Length:
R (m) | 2.5 -25.75m | 30 | 35 | 40 | 45 | 50 | 55 | 60 |
a=2 (t) | 6t---48.85m | 5.84 | 5.20 | 4.25 | ||||
a=4 (t) | 12t-- | 10.3 | 8.34 | 7.08 | 6.11 | 5.34 | 4.70 | 3.5 |
55m Jib Length:
R (m) | 2.5- 25.87m | 30 | 35 | 40 | 45 | 48 | 50 | 53 | 55 |
a=2 (t) | 6t---50.85m | 5.73 | 4.7 | ||||||
a=4 (t) | 12t | 10.16 | 8.52 | 7.31 | 6.36 | 5.9 | 5.62 | 5.23 | 3.95 |
- Q:I'm curious
- Shortly okorder /
- Q:If garden gnomes and oragami cranes were to battle with one would win?
- Staring Contest!!! (THAT NEVER ENDS!!!) Dun Dun DUNNNNN!!!!!
- Q:or is jason mraz just making up things for lyrics?
- No. They are lifted into place in sections by one or more other cranes, the telescopic arm kind, which are either in a nearby street or on the building site. I watched several being built and then dismantled over a period of three years at a large development across the street from my house. However, I saw a TV programme about how they built one on top of a mountain, and there they used helicopters to lower the sections into place.
- Q:If you were to give someone a paper crane with an ayat or hadith (has to be short, as I have to write on its wings)... what would you write?I was thinking of writing this:Peace be upon you for what you patiently endured. And excellent is the final home. [13:24]I'm not sure though...lol. Any ideas? Salam.
- I like these To thee have We granted the Fount (of Abundance). Al-Kauthar – ( 108:1 ) Say: I seek refuge with the Lord and Cherisher of Mankind An-Nas - ( 114:1 ) By (the Token of) Time (through the ages), Verily Man is in loss Al-‘Asr – ( 103:1-2 ) Say: I seek refuge with the Lord of the Dawn Al-Falaq - ( 113:1 ) Read in the name of your Lord who created, Created man from clots of blood. Iqraa - ( 1-2 ) Say : O ye that reject Faith! I worship not that which ye worship Al-Kafirun – ( 109:1-2 ) And seek help in patience and prayer al-Baqarah - ( 2:45 ) Eat and drink, but waste not by extravagance al-A’raaf - ( 7:31 ) And whenever you give your word, say the truth al-An’aam - ( 6:152 ) Edit My Favorite Quotations “Heaven lieth at the feet of mothers.” Prophet Muhammad P-B-U-H “The ink of the scholar is more holy than the blood of the martyr.” Prophet Muhammad P-B-U-H A good dream (that comes true) of a righteous man is one of forty-six parts of prophetism. Prophet Muhammad P-B-U-H A true good dream is from Allah, and a bad dream is from Satan. Prophet Muhammad P-B-U-H Whoever sees me (in a dream) then he indeed has seen the truth. Prophet Muhammad P-B-U-H When I want to read a novel, I write one. Benjamin Disraeli Imagination is more important than knowledge. Albert Einstein The value of a man should be seen in what he gives and not in what he is able to receive. Albert Einstein Wars come and go, but my soldiers stay eternal. Anonymous
- Q:I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
- The use other large cranes. They put them up there piece by piece, and sometimes use cranes on the ground to hold pieces up while they assemble them.
- Q:Who would win a fight between a Whooping Crane and a chinchilla?
- Chinchilla. They have powerful teeth, dense fur (for armor) and they are very fast. A whooping crane has very fragile bones, and when birds are cut they tend to bleed uncontrolably. They crane could simply fly away if it was uninjured, but by running away it means the chinchilla has won.
- Q:i will like to crane operator?
- You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
- Q:What is the difference between a tower crane and a jack up tower crane?
- The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.
- Q:What can paper crane symbolize?
- Paper cranes symbolize peace. They are a part of origami art, originating in Japan. That country of course was horribly decimated in WW2.
- Q:How do cranes get from one construction site to another without hitting streetlights, wires, car, buildings?
- They dodge by the stuff as they fly along. Duhhh
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TOWER CRANE SL7032 lifting mechanism adopts speed regulation by frequency control
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords