ZHONGLIAN BRAND TOWER CRANE SL6024

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!
PLEASE FREELY CONTACT US FOR INQUIRY!




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is tower crane? What are the types and features?
According to the movement can be divided into: walking type and fixed type. The fixed tower crane tower body can not be fixed, installed on the whole concrete foundation, or installed on the strip or X concrete foundation, and the walking type can be divided into four types: caterpillar type, automobile type, tyre type and track type. In the construction of housing, the general use of fixed type. It can be divided into two kinds of horizontal boom, luffing and luffing of luffing arm according to its variable amplitude. According to its installation form, it can be divided into three kinds: self lifting, integral quick dismounting and assembling. The most widely used are down slewing, rapid dismounting, track type tower cranes and self elevating tower cranes which can be used with four machines (track type, fixed type, attached type and internal climbing type).
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The wall pieces should be rigidly connected on the wall of the embedded parts.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:What are the lifting moment requirements for tower cranes?
3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:Calculate the tower crane gantry crane
It's a gantry crane, not a tower crane
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range