ZE70-LC Good Quality Excavator Cheap ZE70-LC Excavator Buy at Okorder

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Name: ZE70-LC Excavator

Parameter:

Engine

Model

Cummins B3.3(Tier2)

Type

4-cylinder, in line, natural suction, Water cooling

Power

45KW/2200rpm

Travel System

Travel Speed

3.14/5.26(km/h)

Traction

67.7KN

Gradeability

70%(35°)

Digging Force

Arm Length

1650mm

Bucket Digging Force

53.6KN

Arm Digging Force

39.9KN

Bucket

Bucket Capacity

0.12-0.32m3

Bucket Length

820mm

Lubrication

Fuel Tank Capacity

170L

Cooling System

20L

Engine Oil

13L

Slewing System

Slewing Speed 

11.2r/min

Rear Slew Radius

1750mm

Operating Weight & Ground Pressure

Operating Weight

7100Kg



ZE70-LC Good Quality Excavator Cheap ZE70-LC Excavator Buy at Okorder

Advantage:

Fortune500

Custom AA

State-owned company


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Product description:


•It adopts originally imported Cummins B3.3 engine which features Tier 2 standards, energy saving, environmental care, and convenient service and maintenance;
•It adopts radial seal air filter with pre-filter which effectively prolongs engine life, with fuel filling pump as standard device.
•It adopts originally imported hydraulic parts, which features stable and reliable quality, high efficiency, and big digging force;
•It adopts new type cab and seats, and reinforced working device, which make it possible for 360°slewing within the radius of 3.7m, featuring good adaptability.
•The electric control system features real time monitoring, automatic self-diagnosis and recording, electric throttle, and 4 kinds of work modes.
•The dozer blade and breaker pipeline are available as standard devices for multiple operations like digging, landfill, breaking, and grading.
•The multifunctional GPS can achieve remote control and data transfer so that the real time machine conditions can be known.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the speed of a wheel loader?
There are two kinds: 1,10KM/h, this is mainly done in the mining area shovel work, requiring speed is not allowed to exceed 10KM/h, if exceeded, it will increase the body parts, including tires, wear and damage. 2,50KM/h, the sense of speed, for some of the more professional vehicles, imported wheeled loader in the mining area in the heavy speed in general for 35KM/h, no-load about not exceeding 50KM/h.
Q:The role of Loaders
In addition, the soil can be pushed, flat ground and other mechanical traction operations. As the loader has the advantages of fast operation, high efficiency, good maneuverability and easy operation, it has become one of the main types of earthwork construction in the construction of the project.The loader is a kind of earthwork construction machine which is widely used in highway, railway, building, hydropower, port, mine and other construction projects
Q:30 and 50 loaders, 8 hours a day, and their oil, earthwork, long-term work, long working hours in a car, about how much money, monthly
30 according to the workload of 8 hours a day, oil and drivers 1300 yuan, 50 yuan per day, 2000, long-term concessions, but not much.
Q:A 50 a class loader is how much money?
I don't know you say what is the meaning of the team, now loader is almost the price of 160 yuan to 190 yuan, to see what to do, burning their own oil, I was engaged in loader!
Q:What's the brand of a small loader, 4102 engine?
Note that torque converter oil (also known as hydraulic transmission oil) cleaning, can not be missing, and then pay attention to do not heat, this type of car ran Louis high temperature (some brands this problem is better)Pay attention to maintenance according to instruction
Q:Loader maintenanceThe ammeter in the loader is light, please ask the reason
Maintenance is to play butter, check whether the instrument is normal, to see whether the body has oil leakage, check the oil brake oil enough
Q:How do I change the speed change valve of the loader?
The piston chamber of the old valve is provided with a pressure regulating ring restricting the piston movement, and a pressure regulating ring is removed, so that the piston can compress a spring more, and the pressure can be raised. No new pressure ring, but the core shaft pressure spool out more, can be set on one or several suitable washer, spring is compressed to make the same amount of increase, high pressure, and vice versa.
Q:Is the loader driver a special type of work?
Loader driver is a special type of work, as follows:I. brief introduction of special types of work:Special work refers to the work of special posts collectively, refers to the prone to casualties, the operation of himself, others and the safety of the surrounding facilities, there is a major hazard to the work. The former State Ministry of labor in underground, high altitude, high temperature, heavy physical labor and the range of toxic and harmful types as special types and clear special types are determined by the industry department or the Department of labor. Special types of work, different from special operations, are two different concepts.Two, detailed examples of special types of work:1. electrical work. Including power generation, power transmission, power transmission, electrical distribution, electrical equipment installation, operation, maintenance (maintenance), test workers, underground electrical fitter;2. metal welding and cutting operation. Welding and cutting operator;3. lifting machinery operation. [including crane driver, cable operator, signal conductor, installation and maintenance worker]4. driving motor vehicles in enterprises. Drivers of all types of motor vehicles including the production areas and construction sites within the enterprise, docks, freight yard, etc.;5. uphill erection work. More than 2 meters above the height of erection, demolition, maintenance, high-rise building (construction) building surface cleaning workers;6. boiler operation (including water quality test). Operator of pressurized boiler, boiler water quality tester;
Q:Where is the loader driver?
China Education Association building construction machinery occupation education Specialized Committee in designated training institutions or your local excavator loader production factory is located in the local customer service training department registration to attend training certificate to the bid committee through the formal learning and examination after.
Q:The two axle assembly is at the loader's location. Who can help me explain? Thank you
The two axle assembly is in the torque converter of the loader, and after the torque converter is opened, it can be seen at the end of the movement.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range