• YONGMAO STL1000C tower crane System 1
  • YONGMAO STL1000C tower crane System 2
  • YONGMAO STL1000C tower crane System 3
YONGMAO STL1000C tower crane

YONGMAO STL1000C tower crane

Ref Price:
get latest price
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane Model Type:Luffing

Max. Lifting Capacity:50T

Tip load:6.5T

Arm Length:60M

Independent Height:48.4M


Founded in the year of 1996, Yongmao is one of the key suppliers specialized in manufacturing construction machinery and engineering equipment.

We currently offer a variety of tower cranes which are broadly classified under the Topless STT series, the ST series, the Luffing STL series and the Derrick QD series, as well as crawler cranes and modified vehicles.

Yongmao tower cranes have not only been working for various domestic projects like hydroelectric power plants, nuclear power plants, shipyard, wharf, bridge, aerospace etc. but also acting in numerous construction projects all over the world.

Yongmao appreciates the reliance and confidence given by its valuable users all over the world and feels very proud of its ability and capability to contribute value added services to its users both at home and abroad.

Q:if a crane just shows up and doesn't go what does that mean
Likely means someone is about to build a skyscraper in your neighbourhood.
Q:How to improve tower crane industry in china?
Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q:Basically what it says on top. Also provide maybe a video to prove it.
Do you watch American Dad? And i think it would be difficult for it to actually work unless you modified it so no if its a traditional origami crane, but if you work backwards and made the wings of the crane to resemble a paper airplane then i think its possible
Q:Denny Crane (played by William Shattner), and Alan Shore (played by James Spader) are partners in a Boston law firm. I would like to know if those those two are father and son in the series,
SPOILER ALERT So far we have seen Donny Crane in Season 1's in Catch and Release we found that he isnt his son and than again in Season 1's Tourted Souls and Season 2's Squid Pro Quo
Q:a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
Q:I just made origami cranes and want to hang them up, each by themselves with just a peice of string....how should i go about doing this? how is it usually done?
TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
Q:Please write in days, hours, weeks, etc.I need math help!!!!
7*60 / 60 + 11/60 = 420+11 / 60 = 431/60 seconds to make 1. 431/60 * 1,000,000 = 431,000,000 / 60 = 43,100,000/6 = 21550000/3 seconds. 21550000/3 / 60 = 21550000/180 = 2155000/18 = 1077500/9 minutes 1077500/9 / 60 = 1077500/540 = 107750/54 = 53875/27 hours 53875/27 / 24 = 53875/648 = 83.14040987654320987654320... days. 0.1404098765432098765432...*24 = 3.37037037037037... hours. .37037037037037037... *60 = 22.22222222222... minutes 0.2222222222222*60 = 13.333333333333333 seconds. 83 days, 3 hours, 22 minutes and 13 1/3 seconds.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords