YHXScissors Aerial Work Platform High quality and cheap

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
99 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


































































Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to use an electric basket properly?
2, more than the safety lock calibration period should be promptly sent back to manufacturers and re calibration overhaul, the calibration for a period of 1 years.
Q:Dimensions of exterior wall hanging baskets, dimensions of exterior wall hanging baskets
ZLP63 type electric hoist basket components: (LTD6.3) 2 (LSG20), lock 2, 1 sets of electric control box, the roof hanger 2 pay, 1 sets of working platform, steel wire rope (8.3 mm diameter) 4, limit switch (JLXK1-111) 2, manual handle (COBB1) 1 cable, (3 * 2.5+2 * 1.5) 1, safety rope 1; self-locking device 1.
Q:How to transplant basket?
If it is new, then add the soil in the new pot, and then cut down the plant and plug it on the surface of the new soil, pay attention to it!! The soil can not be over the heart. Just water it. No matter what kind of transplant, it's the same thing
Q:Electric basket acceptance should pay attention to what problems?
The installation and disassembly of the basket (including the two shift) is carried out by the property right unit. Basket installation and disassembly (including the two shift) before, should develop the installation and disassembly program, and reported to the general contractor units and supervision units for the record, while the installation of workers to carry out safety technical disclosure. The general contractor shall ensure that the installation conditions are met at the site. The installation and disassembly of the basket (except the Porter) shall be valid for the construction operation qualification certificate of special construction operation. It is forbidden to install or disassemble the gondola without permission.
Q:Calculation of engineering quantity of electric hanging basket
According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
Q:What kind of hanging basket can be used for external wall construction?
Material used: toughened glass is a prestressed glass reinforced with good mechanical properties of thermal shock resistance of the glass to enhance the strength of glass or glass through the use of physical surface compressive stress of glass bearing force first offset surface stress to improve the bearing capacity and improve the tensile strength of glass toughened glass has the advantages of two the strength is higher than the ordinary glass several times bending strength of glass 35 times the impact strength of glass is 510 times higher strength and also improve the safety use of safety glass second main advantages of its carrying capacity increased to improve the fragile nature of the toughened glass breaking bad search was acute debris damage extremely reduce the tempered glass heat shock resistance properties is 23 times higher than ordinary glass. Under 150LC temperature changes to prevent thermal breakage while according to the production of tempered glass tempered physical tempered two physical physical tempered glass At present, the widely used and toughened by quenching medium with liquid cooling, air-cooled tempered tempered cooling plate steel
Q:What are the mandatory requirements for the use of gondola cars?
1) all operators must read the instruction manual of the basket carefully. If they do not understand the requirements, they can not operate on the hanging basket.
Q:The ratio of the maximum overturning moment of the overturning moment and the rated load capacity of the suspension platform to the center of the overhang of the suspension platform shall not be less than that of the suspension platform
Wire rope hanging from the end of the suspension platform distance should be less than 114 of the length of suspension platform, suspension anti overturning torque and rated load concentration caused by suspended platform overhanging section center maximum overturning moment ratio shall not be less than 1.50. 9 all the exposed parts of the electric basket shall be equipped with protective devices.
Q:Who has a good way to clean the basket and the basket?
2, the timely removal of electric basket safety lock surface and the safety rope on the debris, pay attention to safety protective measures to avoid debris into the lock, causing safety lock failure and failure. Avoid collision safety lock operation, operation good protection, prevent rain, snow and other debris into the safety lock in
Q:Request a basket construction quota
General calculation method: (1) according to the construction organization design, the selected number using basket basket, determine the shift number according to the construction period, select the unit according to the market rental price execution. (2) if there is no construction organization design, should be selected according to the number of actual basket, on the basis of the construction team to determine the number of single diary or visa

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range