XDCY-40 2cbm Scooptram Diesel LHD Load

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

A loader (bucket loader, front loader, front-end loader, payloader, scoop, shovel, skip loader, or wheel loader) is a heavy equipment machine used in construction to move aside or load materials such as asphalt, demolition debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material, rock, sand, woodchips, etc. into or onto another type of machinery (such as a dump truck, conveyor belt, feed-hopper, or railroad car).


Main Product Features:

1. Adopts America DANA torque converter and power shift gearbox.

2. Working brake adopts hydraulic applied and spring released. Parking brake adopts spring applied and hydraulic released.

3. Front drive axle adopts American NO-SPIN differential.

4. Rear axle adopts double supports swinging rack to reduce the failure rate.

5. The bucket adopts V structure and reduces the shovel resistance.

.


Product Specifications:

Diesel Engine: F6L912W/BF4M1013C/F6L914

Min. Ground Clearance: 260MM

Hydraulic Torque Converter: C272

Leaving Angle: 16°

Power Shift Transmission: RT20326

Rear Drive axle Swing Angle: ±8°

Drive Axle: No-SPIN antiskid differential

Running Radius: First Gear 0~4.4 KM/H Second Gear 0~10.7K


FAQ:

Q1: Can the bucket can be replaced with other devices or tools?

A1: Yes, The bucket can be replaced with other devices or tools—for example, forks to lift heavy pallets or shipping containers, and sometimes a hydraulically opening "clamshell" bucket to act as a light dozer or scraper. The bucket can also be augmented with devices like a bale grappler for handling large bales of hay or straw.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Wheel Loader according to customers request?

A4: Yes, we can produce Wheel Loader according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.





XDCY-40 2cbm Scooptram Diesel LHD Load

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:50 bucket capacity of loader
50 loader bucket guarantee capacity of 2.8-3.0, increase the fighting for the 3.6 party.
Q:The loader is out of water. Will it change?
The front cover can not be opened. Add water to open the plastic lid beside it! Water tank cover usually does not need to be opened. To add antifreeze, please open the water tank cover, the landlord will not know which is the Deputy tank, look!
Q:Liugong and Xiamen, lonking loaders performance what
The preferred vehicle weight is, the car is durable, long car light, Liugong high fuel consumption.
Q:What is the structure of a loader? Which parts and accessories are included?
Steering line: fuel tank, steering pump, steady flow valve (or priority valve), steering gear, steering cylinderThe gearbox has an integral (planetary) and a split (fixed shaft) twoIs it a mess? Plus 695081096, there is time to tell you slowly, professional maintenance loaders
Q:Why are loaders charging 24?
Mainly depends on the power to start the motor, if the use of 12V power as the starting motor power, the current will be doubled, and related wires will be thicker and increase costs.
Q:Engine power of dragon 50 loader
Lonking to give what the engine installed what you are not sure what is the most general Weichai WD615 162KW 220 horsepower
Q:How much is the weight of the 50 buildings loaders
Specific models are different, self weight is different, generally more than 16 tons.
Q:How do I change the speed change valve of the loader?
The piston chamber of the old valve is provided with a pressure regulating ring restricting the piston movement, and a pressure regulating ring is removed, so that the piston can compress a spring more, and the pressure can be raised. No new pressure ring, but the core shaft pressure spool out more, can be set on one or several suitable washer, spring is compressed to make the same amount of increase, high pressure, and vice versa.
Q:235-25 how heavy is the loader tire?
The tube or tire?!The inner tube, about 40/50 poundsTyre then there should be about 3/400 kg.
Q:How to maintain the loader and other files?! Twenty
This is the shift delay time is too long. Time lag refers to the time interval from the start of gear to the beginning. The reason for the delay time is too long. If you live in 1, the liquid level is too low, which will cause the main oil pressure to be too low and the oil pressure ripple. It usually takes 3-4 seconds to start the gear. 2 oil pump wear,.3 main pressure valve failure. The pressure regulating valve is stuck on the drain side or the spring of the regulating valve is too soft. Some of the pressure regulating valve is adjustable. 4, the force device clearance is too large, or the sealing of the working oil circuit is not good. The force device mainly refers to the clutch and brake.Other stalls not more symptoms, the 80% is in the gear box above the cutting, cutting the lid off, there is a spring for a long period, the OK, because the spring, spring can not stand the seal, so take some time to settle the oil. So he will file.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range