XD926 Side Dump Underground Loader for Mining

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

A loader (bucket loader, front loader, front-end loader, payloader, scoop, shovel, skip loader, or wheel loader) is a heavy equipment machine used in construction to move aside or load materials such as asphalt, demolition debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material, rock, sand, woodchips, etc. into or onto another type of machinery (such as a dump truck, conveyor belt, feed-hopper, or railroad car).


Main Product Features:

1. China famous brand YTO 4 cylinders engine.

2. Hydraulic transmission and hydraulic steering.

3. Countershaft power-shift gearbox, torque converter.

4. Air over hydraulic break system, caliper break system.

5. Wheel reduction axle, automatic bucket flat.

6. Over load protection system

7.Optional: Three-way catalytic converter, wheel protection chains


.


Product Specifications:

Model

XD926

Main   specifications

Bucket   capacity (m3 )

0.8

Rated   load (t)

2.0

Weight   (t)

5.2

Lifting   time of the arms (s)

≤4

The   sum of three items(s)

≤8

Forward   gearkm/h

I   0-7  II 0-24

Reverse   gear

I   0-7  II 0-24

Max.   climbing gradient

30°




FAQ:

Q1: Can the bucket can be replaced with other devices or tools?

A1: Yes, The bucket can be replaced with other devices or tools—for example, forks to lift heavy pallets or shipping containers, and sometimes a hydraulically opening "clamshell" bucket to act as a light dozer or scraper. The bucket can also be augmented with devices like a bale grappler for handling large bales of hay or straw.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Wheel Loader according to customers request?

A4: Yes, we can produce Wheel Loader according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


XD926 Side Dump Underground Loader for Mining

XD926 Side Dump Underground Loader for Mining



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:50 bucket capacity of loader
50 are usually 3 sides, and Iwa Ishito is 2.7 parties (all 50 cars)Like Jin engineering Xiamen, earthwork bucket are 2.8 party rock bucket will be smaller.
Q:How high is the water temperature of the loader?
Generally below 95 degrees are not what the problem is, we could not.
Q:What about the high loading and unloading capacity of Baidu 50 loader at 30?
50 loader handling height generally above 290, 30 do not know
Q:Laigong Lu Yu Gongming loader which brand of good quality
These two brands are not good, the best Ming Yu, the first national production and marketing, materials, fine workmanship, the weight of a large, powerful, fuel-efficient, run fast!
Q:50 is the price of the loader 50?
The price of the 50 shovel is basically around 350 thousand. With 5 years, your shovel has basically been unable to use, long-term rent outside, no one will give you maintenance or careful use. Basically, 70 thousand a year. After 5 years, you can sell 100 thousand yuan, or lower.You're 9000 yuan a month. A day to 300 yuan.Do you know how the excavator doesn't count? Bring the driver to refuel for 100 yuan an hour. 8 hours a day is 800 yuan.The price is pretty much the same!!!
Q:A 50 a class loader is how much money?
Burn your own oil, usually 180-220 per hour, do not burn their own oil, according to the daily count, 800 or so a day!
Q:Where is the difference between a loader and a pilot without a pilot?
Save strength, operation sensitive, a handle can operate.
Q:Is the factory loader special?
According to the "special equipment safety supervision regulations" (State Council Decree No. 549th) regulations, approved by the State Council, the State Administration of quality supervision, inspection and Quarantine issued the "supplementary catalogue of special equipment" (national quality inspection special 2010 No. 22, hereinafter referred to as the "Catalogue"), clear into the safety supervision of special equipment (field factory) in special vehicles (hereinafter referred to as the "factory") range.If you do not meet the "special equipment safety supervision regulations" article ninety-ninth in the definition of "special vehicles" characteristics of the field (plant) in other motor vehicles are not belong to special equipment in the field (plant) in special vehicles (hereinafter referred to as "non factory car" equipment, such as before) belong to the "factory" loaders, excavators and bulldozers have been classified as "non car factory".[special equipment] refers to the safety of life and the risk of large boilers, pressure vessels (including gas cylinders, the same below), pressure piping, elevator, crane, passenger ropeway, large recreation facilities and field (plant) in special vehicles. Among them, boilers, pressure vessels (including gas cylinders), pressure pipes for pressure type special equipment; elevators, lifting machinery, passenger ropeway, large recreational facilities for mechanical and electrical special equipment.
Q:Consult bucket width of loader
30 is 2 meters, 4 or so, and 50 is about 3 meters
Q:How to maintain the loader and other files?! Twenty
Loader and other gear is the two axis (also known as overrunning clutch) there is a problem, you can change it! ~

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range