WPC Door Frame Looks and Feels Like Real Wood

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
8 m.t.
Supply Capability:
200 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1> What is WPC?


WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.


2> Why choose WPC decking?


 Natural colour
 Resistance to water, rot and crack
 Guaranteed to last
 Low maintenance
 Beautiful and broad range of finish


3> What are the main kinds of WPC currently?

Door frame

Wall panel


Wardrobe door panel




Product Description




4> Specification of WPC?





Moisture Resistance


Water absorptive

Rot Resistance


Rot except special treating

Split Resistance

No Cracked

Cracked by weathering effect

Distortion Resistance

Almost no Contraction/expansion

Distorting effected by chang of 

moisture and temperature

UV Resistance

High Grade UV Resistance

Easily effected by UV

Fading Resistance

Almost no

Easy to fade

Outdoor adaptability


Only few of treatedowood adaptive

No need painting

No need

Need paint periodically


> 8-15 years

< 3 years< span="">

Various Configuration

Extruded via various mould


Environment Effect

Recyclable 100%

Consume woods




 made in china best selling wpc door frame




Company Information




5> About CNBM and It’s WPC products


China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 
 Our unique advantages: 
 Preferential payment terms 
 good and reasonable price 
 quality guarantee -- CNBM won't let a single small deal ruin our reputation and brand, so quality is

 our lifetime. 
 professional team for CRM order processing & QA & logistics 
 global logistic database, originated from Dubai






Packaging & Shipping




6> How to buy and concerned terms

MOQ – 800m per item 
Lead time—2 weeks 
Departure port—Shanghai 
Package-- PE film, carton box or 2pcs.bundle, treated pallet


7> Certificates and Quality guarantee

Certificates – CE&ISO 9001 complied 
Warranty—10 years 
Quality guarantee—test report for each order under the strict management system


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can ordinary sliding windows be installed with stealth screens?
There is no problem with the technology, can be installed; the problem is to be installed in the window outside, that is, the top of a window outside the top, after the end of the window can not be moved, the sealing effect is no problem, but the biggest drawback is paint Glass when the inconvenient, the inside of a window can not be completely applied to; you can choose "Lu Cheng" brand can be demolition cleaning, or with the flat;
Q:What are the steps behind the construction of the building after the closure?
The frame is made up of the staircase or the staircase. Mixed structure: do ash cake, elastic line, ready to accept and install the door frame.
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Hello: doors and windows of the installation methods are plug and mouth two "plug" to install this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:What is the box method installed in the doors and windows?
Sub-box installation is another way to install plastic doors and windows. It is in the hole to install a sub-box, sub-box in the foot directly into the cement mortar wall, sub-box installation must ensure that the horizontal and vertical, so that the installation of the window can be achieved to achieve horizontal and vertical. With this installation method, the doors and windows frame and the wall completely out, and can be completed in the cement mortar after all, so it will not cause pollution. In addition, due to the use of the sub-box, so that the installation quality of doors and windows easier to get control, but also reduce the plastic doors and windows due to thermal expansion and contraction caused by the expansion and contraction.
Q:Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
Can also be carried out at the same time, the focus is the curtain wall and doors and windows at the mouth to deal with ~
Q:Why do wooden doors and windows installed is the first installation of windows and doors after plastering and metal doors and windows and plastic doors and windows is the first plaster into the mouth after the installation
Door and window construction with dry construction and wet construction
Q:There are doors and windows installed with main and auxiliary boxes
Plus the skin are generally have a gap of about 3 mm design itself is to stay good to put the skin to strengthen the watertight
Q:Plastic window around the gap with cement plug or foam plug?
The gap is too large to use cement to block, more solid;
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.
Q:Is not all the doors and windows are located in the middle of the wall?
Not necessarily, you are assigned by the Party. If he wants to press double windows. It should be pressed out.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range