Wood Plastic Composite High Quality Anti-pet

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
20000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of WPC Decking :

WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.

 

 

WPC can be used for military equipment, urban utilities and landscaping, architecture,

gymnasiums, outdoor decking, fencing, pallets, indoor and outdoor decoration.

Description Main Features of the WPC Decking:

10years warranty;
10days delivery time;
more flexible payment terms;
thousands of mould for choice.

 

   indoor wpc flooring

   deck wpc solid

 WPC Decking Images:
Wood Plastic Composite High Quality Anti-petWood Plastic Composite High Quality Anti-petWood Plastic Composite High Quality Anti-pet

 WPC Decking Specicication:

 

Wood Plastic Composite High Quality Anti-pet 

FAQ of WPC Decking :

 1> Why choose WPC decking?

 *Natural colour
 *Slip resistant
 *Resistance to water, rot and crack
 *Guaranteed to last
 *Low maintenance
 *Beautiful and broad range of finish

 

2> What are the main kinds of WPC currently?

 *WPC decking board
 *DIY decking board
 *WPC wall panel (wall cladding)
 *Garden fence (railing)
 *WPC outdoor furniture (gazebo, pavilion, outdoor desk&chair, dustbin, pet house…)

3> Ingredients of WPC?

 

30% HDPE+60% bamboo/wood fiber+10% Chemical additives.

 

4> How to buy and concerned terms?


*MOQ – 300m2 per item 
*Lead time—2 weeks 
*Departure port—Shanghai 
*Package-- PE film, carton box or 2pcs.bundle, treated pallet

 

5> Certificates and Quality guarantee

*Certificates – CE&ISO 9001 complied 
*Warranty—10 years 
*Quality guarantee—test report for each order under the strict management system.

 

 6> About CNBM and It’s WPC products

 

China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to shop the natural wood flooring
Enough height, you can choose a direct shop, but solid wood, solid wood composite is generally recommended to play keel paving. This can play a role in moisture.
Q:Composite floor room on the threshold of the cover plate loose, how fixed?
This is very simple! This thing hurt the anger engraved moxibustion smoked puffing and shredding, will be removed, the gap in the clean dust, the original bar is also clean off the original glue, buy a glass of plastic, the back of the amount of hit, put in place, above It is best to place heavy objects fixed, 24 hours after the normal use.
Q:Peace of mind composite floor is good
To say the floor, like the elephant, the Yangtze, these are big brands, feeling the quality should be no problem, that is expensive, slightly cheaper point I really know a good sign, my sister married when the new house The official car to pull the rules and regulations of the sea, to buy the Cheung Yun floor, one, Cheung Yun ~ how festive, beautiful color, and only 80 blocks. To now our family's baby "Zhuangzhuang" (Sister's child) every day on the floor roll, that floor is really very good at life is not changed, so that ah, the floor had to buy this ~! I hope you bought it
Q:My home is warm, has been heating, the composite floor was blisters how to do
1. Dry the surface water on the floor in the shortest possible time. 2. If it is a small area of ​​soaked in water, it is recommended not to strengthen the floor pry dry, so easy to strengthen the floor caused by hard damage, it may cause irreversible use of serious consequences. It is best to quickly remove the floor of the baseboard, exposing the expansion joints, by the expansion of the water vapor will be distributed, according to the size of different seepage, dry up usually takes about three to ten days. 3. At the same time take the vacuum cleaner in the bubble floor of the splicing gap suction water vapor, or take the dryer with cold air dry, but do not use hot air blowing, to prevent the surface caused by dry and dry deformation caused by dry. 4. If it is a large area soaked in water, should promptly notify the floor after-sales service, and try to keep the floor without deformation of the floor carefully pry up, according to "well" font stacked placed dry, with its stacking The weight to prevent the occurrence of deformation, while attention can not be placed under the sun exposure, it should be placed in the ventilation at the dry, under normal circumstances for better quality solid wood flooring can be used again. 5. It is best to replace the floor which has been drilled with water, and it is not recommended to plan the part of the arched and re-paint. As the arch part will be flattened, the paint will lead to other Coordination, and the uneven thickness of the entire board, the force is different, prone to pits.
Q:Solid wood flooring installation need to pay attention to it
Do not understand, to complete the task only
Q:Mianqi composite floor drum up how to do?
Less than two months after the floor pavement drum up, this is the installation of quality problems. Should be in accordance with the floor of the relevant provisions of the sales, requiring businessmen to send people to the scene. In general, if only improperly installed, too close, leaving the gap is small, you can open, and then re-pavement on the line. But if the composite floor of the original adhesive layer stratification, it is the quality of the floor, they should replace the floor. And, once such a problem occurs, it is best to return. Because, this quality of the quality of the floor is poor, there will be problems later. If your house is on the ground floor, it may be caused by too much moisture on the ground. But if this is the case, the factory workers should be told when you carry out the inspection before installation. If not, it is their approval to meet the pavement conditions, the responsibility is still their. I said these, it is estimated. Or should be sent to the scene after the business to determine. I hope my answer will help you. And then add: If you are not a regular business to buy or other reasons can not be repaired by them. So, after removing the wet cause, it can only be improperly installed. That is, when the pavement did not leave enough expansion of the gap. The repair method is: you can remove the already bulging part, and then re-install one by one, to the wall, the excess part of the cut, and keep the floor and the wall has 10-15mm gap, the gap can Through the installation of the baseboard and cleverly covered.
Q:Composite flooring can generally be used for many years ah
Good floor no problem, ten years or can
Q:Nature of the three-tier parquet and multi-layer solid wood flooring that is more practical
Is there a geothermal home? Three-tier environmental protection is not suitable for geothermal, eleven layers can do geothermal but not environmentally friendly!
Q:Is it good for solid wood flooring or composite flooring?
Solid wood
Q:Composite floor ground leveling problem?
Composite floor ground leveling method: 1, if the pavement of the floor on the flatness requirements are particularly high, such as plastic flooring, must be self-leveling processing, but the higher cost. 2, for the general strengthening of the floor or solid wood composite products, can be a small area of uneven ground to take the way to deal with the gypsum, this method is the lowest cost, the main cost is the wages of workers, the general house to spend 100 dollars You can get, gypsum powder plus 801 glue the cost is also very cheap; and gypsum dry particularly fast, one day ahead can do in the dry season and even the day of construction will do. Oil workers, tile workers, shop floor workers can do. 3, the larger area of the uneven can be used to deal with two ways: First, prior to the way to wipe the cement, to do in advance, otherwise the cement will not pass through the floor to leave the dampness of the hidden dangers, affecting the life of the floor. The cost of this approach is low, the need for tile workers to complete.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range