wing nut series/building material 9

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:
10/12 15/17 20/22
Type:
Scaffolding Parts
Scaffolding Part Type:
tie rod wing nut
material:
QT450-10
specs:
15/17
tensile strength:
above450Mpa
percetage elongation:
above10%
surface finish:
electro galvanized
paking:
bags and pallet
payment:
30% in advance, balance against the B/L copy
customizable:
available
MOQ:
1000 pcs

Packaging & Delivery

Packaging Detail:bags and pallet
Delivery Detail:3 days

Specifications

wing nut series/building material
high quality reasonable price
process: sand casting
surface :electro galvanized

wing nut series/building material

formwork wing nut, tie rod wing nut





product mechnical properties:

Castings of superior quality produced from electric furnace instead of cupola furnace


most suppliers use,thus ensure the homogeneity and stability of the composition and


reduce the casting defects to minimum.all material properties including composition,

tensile/yield strength,elongation conform to the Chinese Standard GB QT450-10 (DIN

GGG450/NF FGS450-10).

Material: ductile Iron QT450-10


Process: sand casting


Tensile Strength: ≥450Mpa


Percentage Elongation: ≥10%


Surface Finish: electro galvanized


Packing: Bags and Pallet


payment: 30% in advnce ,balance against the B/L copy


MOQ:1000pcs



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q:Construction scheme of portal scaffold
This specification is applicable to the design, construction and use of the floor (bottom) door type steel pipe scaffold used in industrial and civil construction. The door type steel pipe scaffold for other purposes (such as chimneys, water towers, etc.) can be carried out in accordance with the principles of this specification.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:Is there any requirement for the installation of the disc scaffold?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q:What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:During what month does Hester mount the scaffold in The Scarlet Letter?
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q:New features of quick dismantling scaffolding?
Preservative treatment: Advanced electrophoresis paint treatment, both inside and outside the paintCorrosion effect is longer than the traditional painting and painting steel tube life of 5-8 years

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range