Wind Turbine 3KW

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
1000 Sets per Month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Detailed Product Description

 

Model

P-2000

P-3000

Name

Wind King

Wind King

Rated power

2000W

3000W

Rated DC voltage

DC 48V

DC 48V

Rated current

42A

62A

Rated speed

374r/m

310r/m

Max power

2500W

3000W

Number of blade

3 pcs

3 pcs

Starting wind speed

3m/s

3m/s

Cut-in wind speed

3.5m/s

3.5m/s

Cut-out wind speed

18m/s

18m/s

Security wind speed

45m/s

45m/s

Rated wind speed

12m/s

12m/s

Engine

Three-phase permanent magnel generator

Three-phase permanent magnel generator

Rotor diameter

3200mm

3700mm

Blade material

FRP (fiber glass reinforced plastics)

FRP (fiber glass reinforced plastics)

Output line anti-winding device

Over all three-phase commutator

Over all three-phase commutator

Over-speed wind protection

Automatically tumed protection + magnetic braking + Unloading pool brake

Automatically tumed protection + magnetic braking + Unloading pool brake

Life span

15 years

15 years

Equipment surface protection

Galvanization plastic coating

Galvanization plastic coating

Working temperature

-45°C-70°C

-45°C-70°C

N.W.

108kg

138kg

Packing material

Wooden case and foam material

Wooden case and foam material

packing dimension

1810*560*390mm

2050*580*360mm

G.W.

140kg

170kg

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I think I'm going to install a home type hydroelectric generator
Don't you the stability of grid connected small capacity can't guarantee you such a small capacity
Q:Advantages and disadvantages of thermal power and hydropower generation
Disadvantages: large investment in fixed assets, high demands on the geographical environment, such as southwest China's abundant water resources,
Q:How much electricity can be produced by wind power in one day
But I can give you a rough estimation method: the wind power generation device in a year on average effective generation time is about 2000 hours, the average power is 5.48 hours.
Q:What is the voltage of the generator?
2009 annual average power generation will reach 84 billion 700 million kilowatts
Q:Small hydraulic generator set out of electricity, can be directly connected to it?
First, the technical aspects, including the same phase sequence, voltage, frequency, phase similar;
Q:Efficiency and selection of hydraulic generator sets
different sizes of pipe diameter will have different flow rate, flow rate loss is also large
Q:Wind turbine generator material
I can still learn from Guangzhou's official website, MINI 3 series of small wind turbines using wind start design, suitable for sea wind resources relative superiority of native place
Q:Is there any drawback of hydroelectric power generation?
The disadvantage is: ecological damage: below the dam water erosion intensifies, rivers and changes of the animal and plant effects.
Q:Water power generation for national power
which contained the potential energy is converted into kinetic energy of turbine, then water turbine as the motive power to promote the generator to produce electric energy
Q:What is the difference between an ordinary motor and a wind power generator?
The large wind turbine is imported from abroad or part of the introduction of technology, its cost is high, is 3-4 times the cost of small hydropower,
We own professional persons and research equipment on aerodynamics analyse, mechanical design, generator design & manufacturing and electrical regulation. Based on wind turbine whole set basic theory, every model go from science aerodynamics calculate, intensity analyse, electromagnetic calculate, efficiency study, jarring analyse and matching analyse all have detailed design, test and produce plan.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Northern Europe
Southern Europe
Company Certifications RoHS;ISO 9001:2000;SGS CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 71% - 80%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 3,000-5,000 square meters
No. of Production Lines 2
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range