Whole Aluminum Kwistage Scaffolding System

Ref Price:
$194.00 / kg
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Aluminum KwistageScaffolding

With its small area and unique building ways, it will not destroy any obstactes(like desks,stairways and plants),and because of its stability,it won’t damage the wall,convenient to assembly,store and carry.

It can be used both indoor and out door with no noise,more environmental protection and no damage to the ground,it can be built in any working environment and ground.

Scaffolding itself-without electricity operation, free maintenance, easy build and assembly without any tools, can be close to working point tightly.

Excellent design and processing technology as well as Australia/New Zealand standard ensure its high quality and durability

 

2 Aluminum Kwistage Scaffolding advantages:

 

3. Aluminum Kwistage Scaffolding Products pictures:

 Whole Aluminum Kwistage Scaffolding System

4.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

-Whole Aluminum Scaffolding

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
difficult situation. search in google or bing. that could actually help!
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Second, the demolition of disc type scaffolding parts down to classify storage and management, in order to transport, but also a process of removing parts check the parts, to separate the deformation, the rusty parts, don't put the next time in construction.
Q:Having problems with my scaffold/industrial piercing?
have a piercer look at it.
Q:Introduction of external scaffolding
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
Mobile scaffolding in general are on the basis of rent by the day
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q:What are the general specifications of bowl buckle scaffold?
Different specifications of the bowl buckle scaffolding accessories in the use of steel pipe materials and fasteners are different, the price is naturally the larger the price will be more expensive. What are the advantages of bowl-scaffold: Processing 1, scaffolding is very simple, the most commonly used 48 steel pipe, welding on the bowl, fastener scaffold steel pipe improvement can even use the traditional.
Q:How to calculate the vertical force of scaffolding
The calculation of steel tubular scaffold with reference to "construction safety code for steel tubular scaffold with couplers" (JGJ130-2001). Need to calculate the following eight aspects:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range